INSP-Final Inspection | 5/14/2004 | 5/14/2004 | 5/14/2004 | P | PASS |
Rick Jackson
|
|
|
The 5895 power panel was not used nor required; as builts to be provided to owner 5/14/2004 4:41:30 PM
|
DOC - Permit Finaled | 5/14/2004 | 5/14/2004 | 5/14/2004 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 5/14/2004 4:41:42 PM
|
INSP-Final Inspection | 5/13/2004 | 5/13/2004 | 5/13/2004 | P | FAIL |
Rick Jackson
|
|
|
earl; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need updated maps; lobby doors on 6th floor with mag hold opens don't work properly - need extensions; 5/14/2004 7:36:21 AM
|
INSP-Alarm Testing | 5/12/2004 | 5/12/2004 | 5/12/2004 | P | FAIL |
Rick Jackson
|
|
|
earl; Phone #: ###-#### Internet Inspection Request from: Barbara Moore old NAC devices not working and devices on 7th floor not working; candela on strobes not per plans; zone 4 on 6th floor not working; verify all candelas; test flows and all new devices 5/13/2004 7:29:44 AM
|
Issue and Print Permit | | | 3/15/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/12/2004 | | DONE |
|
|
|
|
Alarm Plan Check | | | 3/12/2004 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
Permit Ready to Issue | | | 3/12/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/12/2004 | | 3/12/2004 | | DONE |
|
|
|
|
Telephone call | | | 3/12/2004 | | DONE |
|
|
|
permit ready and fee due
|
Plan assigned to (Mary) | 2/19/2004 | | 3/12/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/11/2004 | | |
|
|
|
|
Alarm Plan Check | | | 3/8/2004 | | FAIL |
|
|
|
Resubmittal required. Faxed comments to Earl Lasater 3/8/2004.
|
Miscellaneous action | | | 3/5/2004 | | DONE |
|
|
|
Received e-mail from Stephanie Cribbs that included the speaker wattage calculations.
|
Telephone call | | | 3/3/2004 | | DONE |
|
|
|
Tom Houston, update on the upgrade agreement. Fire Sentry will be submitting for the 4th and 5th floors to cover the "floor per year for 2002 and 2003". I told Tom that both floors could be done on one submittal and once I received the 4th adn 5th floor submittals, I would review the 6th floor.
|
Telephone call | | | 3/3/2004 | | DONE |
|
|
|
Call with Tom Houston regarding the upgrade agreement. The upgrade agreement stated that specific elevator recall and the 7th floor core (strobes) would be completed by 2001 and a floor per year would be completed after that. Our records show no work has been completed since 2001. Apparently the recall was completed for the 5th floor last year (no permit was issued, I will ask Rick to check on it) and they assumed they were fulfulling their portion of the agreement. Tom was going to confirm with the installer.
|
Telephone call | | | 3/3/2004 | | DONE |
|
|
|
Stephanie Cribbs (CSHQA) was inquiring about what was required for a submittal for the 5th floor. I explained the "core" areas and elevator recall. I explained that the 6th floor permit would be on hold until I received the 5th floor submittal, at which time I would get the 6th floor out in a timely manner. I also requested a speaker circuit calculation to ensure the amplifiers are not being overloaded. The battery calculations have been completed using the maximum current available.
|
Application received | | | 2/19/2004 | | |
|
|
|
|