INSP-Final Inspection | 6/14/2004 | 6/15/2004 | 6/15/2004 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/14/2004 at 12:18:25 PM. Contact: ###-####.
|
DOC - Permit Finaled | 6/15/2004 | 6/15/2004 | 6/15/2004 | A | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 6/15/2004 9:38:05 AM
|
INSP-Conference | 6/10/2004 | 6/10/2004 | 6/10/2004 | P | PART |
Rick Jackson
|
|
|
Talked to Jeff of TVFP about the EQ on the new main added and the 2nd floor mechanical room - no ceiling and uprights may be overspaced from east wall above duct work 6/10/2004 2:31:56 PM
|
INSP-Final Inspection | 4/21/2004 | 4/22/2004 | 4/22/2004 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/21/2004 at 1:40:17 PM. Contact: ###-####. Okay to cover the office area but the new main to feed the office area requires EQ 4/22/2004 2:44:32 PM
|
INSP-Sprinkler Rough-in | 3/29/2004 | 3/29/2004 | 3/29/2004 | P | FAIL |
Rick Jackson
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Cold soldering on first floor hall/storage room for upright heads; overspaced at wall to storage area and exterior wall for office area at roof; need spare heads; line on first floor shifted east to keep heads 6 ft apart 3/29/2004 2:14:20 PM
|
Issue and Print Permit | | | 3/4/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 2/26/2004 | | 3/3/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/26/2004 | | 3/3/2004 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/3/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/3/2004 | | 3/3/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/3/2004 | | DONE |
|
|
|
|
Telephone call | | | 3/3/2004 | | DONE |
|
|
|
spoke with Jeff -- permit is ready.
|
(F) Reprint permit | | | 2/26/2004 | | DONE |
|
|
|
|
Application received | | | 2/26/2004 | | |
|
|
|
|