Case Summary | | | 8/28/2008 | | DONE |
|
|
|
|
INSP-Final Inspection | 5/4/2005 | 5/5/2005 | 5/5/2005 | P | PASS |
Forrest France
|
|
|
Fire alarm finaled.
|
Issue and Print Permit | | | 4/14/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 4/13/2005 | | PASS |
|
|
|
Plan Modification. Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/13/2005 | | 4/13/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/13/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/13/2005 | | DONE |
|
|
|
lft vm with chris willis ###-#### that permit and fees are ready to be picked up
|
Plan resubmittals received | | | 4/7/2005 | | |
|
|
|
|
INSP-Final Inspection | 2/4/2005 | 2/10/2005 | 2/10/2005 | A | FAIL |
Troy Cobbley
|
|
|
Provide additional a/v in truck delivery on circuit av-8. Repair a/v9-3 in storage supply. Set high/low pressure switch and test. Liebert #4 does not shut down. Test supervision between new panel/nac's and the existing system. Provide map at new panel and existing panel. Remove old equipment. Resend alarm, trouble and supervisory signals to central station. Verify if existing tamper can remain on old system and if heats need to be shown on new plans. 2/10/2005 8:18:01 AM
|
INSP-Final Inspection | 2/1/2005 | 2/3/2005 | 2/3/2005 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/1/2005 at 12:34:37 PM. Contact: ###-####. cancel per Robert11/2/1/05 2:50pm BAS
|
INSP-Final Inspection | 1/28/2005 | 2/2/2005 | 2/1/2005 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/28/2005 at 10:58:06 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Feb 1 2005 12:32PM.
|
INSP-Final Inspection | 1/25/2005 | 2/1/2005 | 2/1/2005 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/25/2005 at 5:18:33 PM. Contact: ###-####.
|
FIR-Aging Inspection | 1/10/2005 | 1/10/2005 | 1/10/2005 | | PART |
Rick Jackson
|
|
|
This project is nearly completed and inspections will be scheduled when ready 1/10/2005 8:55:22 AM
|
Issue permit | | | 10/11/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/7/2004 | | 10/7/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/7/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/7/2004 | | DONE |
|
|
|
called and talked to chris willis told that his permit and fee is ready to be picked up cmc
|
Plan assigned to (Mary) | 3/2/2004 | | 10/7/2004 | | DONE |
|
|
|
|
Alarm Plan Check | | | 10/7/2004 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
Plan resubmittals received | | | 9/24/2004 | | DONE |
|
|
|
|
Alarm Plan Check | | | 9/16/2004 | | FAIL |
|
|
|
Resubmittal required. Faxed comments to Chris WIllis, Simplex.
|
Plan resubmittals received | | | 8/25/2004 | | |
|
|
|
|
Alarm Plan Check | | | 3/16/2004 | | FAIL |
|
|
|
Resubmittal required.
|
Miscellaneous action | | | 3/15/2004 | | DONE |
|
|
|
Completed site visit. Specific items of interest: 7 Liebert units 20,000cfm each. Proposed smoke detector spacing in each space has different air changes per hour, there is no "air zones" under the floor, the entire area is one large return air plenum. There are obstructions under the floor (4 to 6 inch insulated water pipes).
Mechanical is under design for the entire building. Required "fresh air" for the spaces has not been ducted in. One duct in corridor wall has a fire damper, someone needs to determine the rating of the wall.
|
Telephone call | | | 3/11/2004 | | DONE |
|
|
|
Request for information on air flow for the data center. Chris stated that he would let Peter know and have him get back with me.
|
Application received | | | 3/2/2004 | | |
|
|
|
|