Case Summary | | | 8/28/2008 | | DONE |
|
|
|
|
INSP-Final Inspection | 6/1/2005 | 6/7/2005 | 6/7/2005 | P | PASS |
Forrest France
|
|
|
Fire sprinkler finaled.
|
Inspection Record Card- Fire | 6/1/2005 | | 6/1/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/1/2005 | | DONE |
|
|
|
|
Telephone call | | | 6/1/2005 | | DONE |
|
|
|
talked to receptionist ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 6/1/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/26/2005 | | 5/31/2005 | | PASS |
|
|
|
5/26/2005, 11:30am. Floor plan changed greatly and lack verification of meeting minimum requirements for hte design.
5/31/2005, Received modified plan with revised calculations for verification of the revision.
|
Plan assigned to (Bill) | 5/26/2005 | | 5/31/2005 | | DONE |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/31/2005 | | DONE |
|
|
|
|
INSP-Final Inspection | 5/25/2005 | 5/31/2005 | 5/27/2005 | P | CANC |
Troy Cobbley
|
|
|
kerry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Inspection cancelled from web by: Marsha Smylie
|
Miscellaneous action | | | 5/26/2005 | | DONE |
|
|
|
Received a faxed area floor plan change modification from Tom Easton, which was returned with code questions.
|
Plan resubmittals received | | | 5/26/2005 | | |
|
|
|
Faxed
|
INSP-Final Inspection | 5/13/2005 | 5/16/2005 | 5/16/2005 | P | FAIL |
Forrest France
|
|
|
Two upright heads in vault are spaced too far off wall to meet OH 1 requirements for this space. Provide map at riser indicating location of auxillary drains. Provide test certificates. Verify foreward flow through BFP as required by note #59. Provide sp
|
INSP-Sprinkler Rough-in/Hydro | 2/2/2005 | 2/2/2005 | 2/2/2005 | A | PART |
Rick Jackson
|
|
|
Air test okay; need to add EQ at new main; different heads used in underfloor area; need as-builts for addition to under floor in phone room 2/2/2005 9:45:34 AM
|
INSP-Sprinkler Rough-in/Hydro | 1/31/2005 | 2/1/2005 | 2/1/2005 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/31/2005 at 6:43:05 PM. Contact: ###-####. Start air test at 43 psi 2/1/2005 11:17:05 AM
|
INSP-Sprinkler Rough-in/Hydro | 1/28/2005 | 1/31/2005 | 1/31/2005 | P | PART |
Rick Jackson
|
|
|
Mick; Phone #: ###-#### Internet Inspection Request from: Jan Rice hydro okay 1/31/2005 4:03:52 PM
|
FIR-Aging Inspection | 12/27/2004 | 12/27/2004 | 12/28/2004 | | PASS |
Rick Jackson
|
|
|
Talked to Roger and the work is in process and the final should be called in very soon 12/28/2004 9:30:19 AM
|
Miscellaneous action | | | 11/4/2004 | | DONE |
|
|
|
Removed this permit from BLD03-03054 since after field verification by Rick Jackson, it has no related connection.
|
Issue and Print Permit | | | 9/27/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/24/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/24/2004 | | 9/24/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/24/2004 | | DONE |
|
|
|
Left message for Tom and told him that permit is ready & fees///9/24/04 11:40am BAS
|
Sprinkler Plan Check | 9/8/2004 | | 9/23/2004 | | DONE |
Bill Alexander
|
|
|
Received call from Tom Easton 9/15/04 requesting the 2nd submittal be tossed and replace with 9/20/04. Reference (sent email 09/14/04) regarding beams identified in O.H. cavity which affect upright spacing/coverage.
09/23/04 approved as submitted and per attached REV comments
|
Plan assigned to (Bill) | 9/8/2004 | | 9/23/2004 | | DONE |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/20/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/8/2004 | | |
|
|
|
|
Issue permit | | | 7/26/2004 | | DONE |
|
|
|
|
Miscellaneous action | | | 7/15/2004 | | DONE |
|
|
|
Emailed Tom Easton on why he has not picked up plans. Response is: Wells Fargo is considering a change to the below floor sprinkler system to make it wet instead of pre-action to hold down their alarm costs. I should know if I have to change my design by next week. We have not picked the plans up because I'm sure we will owe more than the current permit fee.
|
Sprinkler Plan Check | 6/16/2004 | | 6/21/2004 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/21/2004 | | 6/21/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/21/2004 | | DONE |
|
|
|
|
Telephone call | | | 6/21/2004 | | DONE |
|
|
|
PERMIT READY AND FEE DUE
|
Plan assigned to (Bill) | 3/8/2004 | | 6/21/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/16/2004 | | |
|
|
|
|
Sprinkler Plan Check | 6/3/2004 | | 6/14/2004 | | FAIL |
Bill Alexander
|
|
|
1. Need backflow prevention per Idaho State Drinking Water Regulation, Title 1, Chapter 8, Section 16.01.8601.04 Article A. w/forward flow appurtenance.
2. Need Revised calcs with backflow incorporated for this and existing systems.
3. Need elevation dimensioning of existing and new 6" and 4" mains.
4. Need locations, ways, means and signage to all trapped piping drains for preaction system.
5. Need data submittals of system air maintenance device.
6. Need information of hangers added for mains and lines which will incorporate trapeze hangers which required engineering and identified on the plans.
7. Sidewall on Preaction systems only allowed if piping is not trapped.
|
Miscellaneous action | | | 6/14/2004 | | DONE |
|
|
|
Took failed documents to "permit desk" for calling and returning.
|
Telephone call | | | 6/14/2004 | | DONE |
|
|
|
plans failed called tom easton to return
|
Plan resubmittals received | | | 6/3/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/8/2004 | | 3/11/2004 | | FAIL |
Bill Alexander
|
|
|
Wrong building permit. Many design code issues that are to numerous to include here. See attached letter response.
|
Miscellaneous action | | | 3/11/2004 | | DONE |
|
|
|
Took failed plans to the front desk for calling and returning. Faxed copy of failed letter to Tom Easton, Simplex/Grinnell.
|
Telephone call | | | 3/11/2004 | | DONE |
|
|
|
Permit denied
|
Application received | | | 3/8/2004 | | |
|
|
|
|