INSP-Final Inspection | 10/29/2004 | 10/29/2004 | 10/29/2004 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/29/2004 at 10:29:55 AM. Contact: ###-####.
|
DOC - Permit Finaled | 10/29/2004 | 10/29/2004 | 10/29/2004 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 10/29/2004 4:25:36 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/8/2004 | 10/8/2004 | 10/8/2004 | P | PASS |
Troy Cobbley
|
|
|
hydro test passed 10/8/2004 3:05:37 PM
|
INSP-Conference | 9/30/2004 | 9/30/2004 | 9/30/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/30/2004 at 8:39:22 AM. Contact: ###-####. Met with Doug about hose outlet placement - install as shown on plans - except on first tier the outlet shall be turned to 45 degrees to allow access 9/30/2004 2:12:37 PM
|
INSP-Sprinkler Rough-in | 9/17/2004 | 9/20/2004 | 9/20/2004 | A | PART |
Rick Jackson
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Okay to cover at FDC only 9/20/2004 10:31:38 AM
|
Inspection Record Card- Fire | 9/8/2004 | | 9/8/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/8/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/8/2004 | | DONE |
|
|
|
permit ready and fee due
|
Issue and Print Permit | | | 9/8/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/26/2004 | | 9/7/2004 | | PASS |
Bill Alexander
|
|
|
Field changes plan.
|
Plan assigned to (Bill) | 8/28/2004 | | 9/7/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2004 | | DONE |
|
|
|
|
FIR-Aging Inspection | 9/2/2004 | 9/2/2004 | 9/2/2004 | | PASS |
Rick Jackson
|
|
|
Work in progress 9/2/2004 9:32:31 AM
|
Plan resubmittals received | | | 8/26/2004 | | |
|
|
|
|
Issue and Print Permit | | | 5/17/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/14/2004 | | 5/14/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/14/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/14/2004 | | DONE |
|
|
|
left a message for Jeff -- permit is ready.
|
Miscellaneous action | | | 5/12/2004 | | DONE |
|
|
|
Recieved a fax from Dave Miller of which we discussed the location of standpipe valves and since it is not a (fire rated) stair emclosure, he is willing to allow the locations to be where shown.
05/13/04
Emailed response to Jeff Anderson.
|
Sprinkler Plan Check | 4/13/2004 | | 4/14/2004 | | PASS |
Bill Alexander
|
|
|
|
Plan resubmittals received | | | 4/13/2004 | | |
|
|
|
|
Sprinkler Plan Check | 4/1/2004 | | 4/2/2004 | | FAIL |
Bill Alexander
|
|
|
Lack enough detail and clarification to verify minimum IFC compliance.
|
Miscellaneous action | | | 4/2/2004 | | DONE |
|
|
|
Faxed copy of failed review to Jeff Anderson-Treasure Valley Fire Protection.
Took plans (less 1) to the call desk for corrections and returning. 3:20 pm.
|
Inspection Record Card- Fire | 4/2/2004 | | 4/2/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/2/2004 | | DONE |
|
|
|
|
Telephone call | | | 4/2/2004 | | DONE |
|
|
|
permit ready and no fees due for new building
|
Application DENIED | | | 4/2/2004 | | |
|
|
|
|
Plan assigned to (Bill) | 4/1/2004 | | 4/2/2004 | | DONE |
|
|
|
|
Application received | | | 4/1/2004 | | |
|
|
|
|