Permit Information
Permit NumberFIR04-00218
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 7303 W DENTON ST
Project NameSPR UG RESIDENCE INN
Customer Number 
ePlanReview 
Description
(Residence Inn - Underground Permit) To installation of 6" C-900 PVC underground fire service supply, including thrust blocking, from the property line in Denton, south approximately 233'-0" to a 45º ell, southeast approximately 25'-0", then 90º northeast into a fire sprinkler "Riser Room" #142 southwest corner and up with 6" Ductile Iron through the floor to approximately 6" to a M.J. adapter and blind flange. There will be no work beyond this point. The trench will be shared with domestic service supply line. The fire sprinkler underground work, including digging, backfill, thrust blocking/retaining, flushing and hydrotesting shall comply with NFPA 13-2002, NFPA 24-2002, IFC-2000 and the attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to Building Foundation and Slab-On-Grade permit: BLD04-00218.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/27/20057/27/20057/27/2005PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Supply line flush6/4/20046/4/20046/4/2004PPASS
DetailsRick Jackson
Sam; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes UG flush okay 6/4/2004 10:58:28 AM
INSP-Supply line flush6/3/20046/3/20046/3/2004PFAIL
DetailsRick Jackson
supply line hydro inspection please///sam; Phone #: ###-#### Internet Inspection Request from: Barbara Moore hydro lost 7 psi 6/3/2004 1:49:42 PM
INSP-Sprinkler Rough-in/Hydro6/3/20046/3/20046/3/2004PPASS
DetailsRick Jackson
UG hydro okay 6/3/2004 4:13:16 PM
INSP-Sprinkler Rough-in/Hydro4/13/20044/14/20044/14/2004PPASS
DetailsTroy Cobbley
thrust blocks ok to cover 4/14/2004 10:05:08 AM
INSP-Sprinkler Rough-in4/13/20044/13/20044/13/2004PPART
DetailsTroy Cobbley
Underground supply piping is ok to cover except for the thrust blocks 4/13/2004 3:08:14 PM
Issue permit  4/13/2004 DONE
Permit Ready to Issue  4/12/2004 DONE
Inspection Record Card- Fire4/12/2004 4/12/2004 DONE
Application received  4/9/2004  
Plan assigned to (Bill)4/9/2004 4/9/2004 DONE
Sprinkler Plan Check4/9/2004 4/9/2004 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  4/9/2004 DONE