INSP-Final Inspection | 11/18/2004 | 11/18/2004 | 11/18/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinkler finaled
|
DOC - Permit Finaled | 11/18/2004 | 11/18/2004 | 11/18/2004 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 11/18/2004 10:23:54 AM
|
INSP-Final Inspection | 11/9/2004 | 11/9/2004 | 11/9/2004 | P | FAIL |
Troy Cobbley
|
|
|
Need breaker locks on the bell, heater and air compressor breakers. Need riser room made to be 1 hour. Test devices for fire alarm interconnection.
|
INSP-Final Inspection | 11/5/2004 | 11/8/2004 | 11/8/2004 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled with fire alarm final 11/8/2004 3:26:47 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/5/2004 | 11/5/2004 | 11/5/2004 | P | PART |
Troy Cobbley
|
|
|
Overhead hydro test passed. Forward flush of backflow passed. 24 hour air test started at 2:30 with 41 1/2 psi on the guage. 11/5/2004 2:41:03 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/3/2004 | 11/4/2004 | 11/4/2004 | A | FAIL |
Troy Cobbley
|
|
|
Overhead hydro test failed. 11/4/2004 12:29:26 PM
|
INSP-Final Inspection | 10/27/2004 | 10/29/2004 | 10/29/2004 | A | CANC |
Troy Cobbley
|
|
|
Wrong permit called in for hydro test. See underground supply line permit for entry. 10/29/2004 2:28:59 PM
|
INSP-Supply line flush | 10/27/2004 | 10/28/2004 | 10/28/2004 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for a hydro test. No test done due to faulty pump and leaks. Will try for afternoon 10/28/2004 12:12:01 PM
|
INSP-Sprinkler Rough-in | 10/27/2004 | 10/28/2004 | 10/28/2004 | P | CANC |
Troy Cobbley
|
|
|
Contact: Brian - 24 Air Test, Would like to start the air test after the Hydro test.; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
|
INSP-Sprinkler Rough-in/Hydro | 10/7/2004 | 10/11/2004 | 10/11/2004 | P | CANC |
Troy Cobbley
|
|
|
24 Hr Air Test; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
INSP-Sprinkler Rough-in/Hydro | 10/5/2004 | 10/7/2004 | 10/7/2004 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled for monday per Brian 10/7/2004 11:12:07 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/30/2004 | 9/1/2004 | 9/1/2004 | A | FAIL |
Troy Cobbley
|
|
|
Not all of the hangers have been removed from the cross webbing of the trusses. In one location the hanger attachment is not scewed all the way into the truss 9/1/2004 10:10:58 AM
|
INSP-Sprinkler Rough-in | 8/25/2004 | 8/26/2004 | 8/26/2004 | A | PASS |
Troy Cobbley
|
|
|
fire sprinklers are ok to cover. After Bill had a chance to review the submittal provided by the contractor for hanging sprinkler it was found that the cross webbing may not support the sprinkler piping. Contractor to provide verification 8/26/2004 9:10:15 AM
|
INSP-Sprinkler Rough-in | 8/23/2004 | 8/24/2004 | 8/24/2004 | A | FAIL |
Troy Cobbley
|
|
|
Still need verification that the hanger attachments is ok to use in 2 x 4 8/24/2004 3:45:56 PM
|
INSP-Sprinkler Rough-in | 8/19/2004 | 8/23/2004 | 8/23/2004 | A | CANC |
Troy Cobbley
|
|
|
Contact: Nate; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
|
INSP-Sprinkler Rough-in/Hydro | 8/20/2004 | 8/23/2004 | 8/23/2004 | A | PART |
Troy Cobbley
|
|
|
Provide sprinklers or insulation in the west overbuild side pockets. Provide missing earthquake bracing and sprig-up as marked on plans. Provide verification that sidesammys will work in 2 x 4's. 8/23/2004 2:09:15 PM
|
INSP-Sprinkler Rough-in | 8/19/2004 | 8/20/2004 | 8/19/2004 | P | CANC |
Troy Cobbley
|
|
|
Contact: Nate; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
Sprinkler Plan Check | 8/4/2004 | | 8/6/2004 | | PASS |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 8/4/2004 | | 8/6/2004 | | DONE |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/6/2004 | | |
|
|
|
|
Telephone call | | | 8/6/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Issue and Print Permit | | | 8/6/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/4/2004 | | |
|
|
|
|
INSP-Sprinkler Rough-in | 7/29/2004 | 7/30/2004 | 7/30/2004 | P | FAIL |
Troy Cobbley
|
|
|
Resubmit plans to city of boise for review of piping modifications. Do not cover pipe until PASS on re-inspection. Piping hangers and earthquake bracing shall be made to top where the loading was designed. See review note #71. Provide verification of single truss supports per review note #67. Provide verification of use of sidewinders supporting 4" main in 2x4 members. See review note #75. Provide verification that 2x4boards being used for trapeze meet nfpa 13 section 9. No items inspected other than those listed above. 7/30/2004 2:19:48 PM
|
INSP-Sprinkler Rough-in | 7/28/2004 | 7/30/2004 | 7/29/2004 | A | CANC |
Troy Cobbley
|
|
|
Jobsite Contact: Nate; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
Issue and Print Permit | | | 5/10/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/6/2004 | | 5/7/2004 | | PASS |
Bill Alexander
|
|
|
2nd review. No Fee
|
Plan assigned to (Bill) | 5/6/2004 | | 5/7/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/7/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/7/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Plan resubmittals received | | | 5/6/2004 | | DONE |
|
|
|
|
Issue permit | | | 4/26/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 4/16/2004 | | 4/23/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/16/2004 | | 4/23/2004 | | PART |
Bill Alexander
|
|
|
Enough to start, but need corrections and related addressed in the attached review comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/23/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/23/2004 | | 4/23/2004 | | DONE |
|
|
|
|
Telephone call | | | 4/23/2004 | | DONE |
|
|
|
Spoke with Ross and told him that permit is ready & fees///4/23/04 9:50am
|
Application received | | | 4/16/2004 | | |
|
|
|
|