INSP-Final Inspection | 9/27/2004 | 9/27/2004 | 9/27/2004 | P | PASS |
Troy Cobbley
|
|
|
Sprinklers match plan except for one area on the bridge was not demo'd. It is being used for Macarthys office.
|
DOC - Permit Finaled | 9/27/2004 | 9/27/2004 | 9/27/2004 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 9/27/2004 2:56:51 PM
|
INSP-Final Inspection | 9/27/2004 | 9/27/2004 | 9/27/2004 | P | PASS |
Troy Cobbley
|
|
|
Sprinklers match plan except for one area on the bridge was not demo'd. It is being used for Macarthys office.
|
DOC - Permit Finaled | 9/27/2004 | 9/27/2004 | 9/27/2004 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 9/27/2004 2:56:51 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/8/2004 | 7/9/2004 | 7/9/2004 | A | PART |
Troy Cobbley
|
|
|
Inspection was for the temporary rated corridor on the 1st floor, north side of the south tower. Sprinkler piping is ok to cover. Approximately 6 sprinkler pendants 7/9/2004 10:04:41 AM
|
Plan assigned to (Bill) | 4/19/2004 | | 4/26/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/20/2004 | | 4/26/2004 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/26/2004 | | 4/26/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/26/2004 | | DONE |
|
|
|
|
Telephone call | | | 4/26/2004 | | DONE |
|
|
|
spoke with Brodey -- permit is ready.
|
Issue and Print Permit | | | 4/26/2004 | | DONE |
|
|
|
|
Application received | | | 4/19/2004 | | |
|
|
|
|