Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR04-00239
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1055 N CURTIS RD
Project NameSPR SARMC-BRIDGE SUPPORT/DEMO
Customer Number 
ePlanReview 
Description
(SAINT ALPHONSUS REGIONAL MEDICAL CENTER, BID PACKAGE #1A, BRIDGE SUPPORT, DEMOLITION & EXIT SYSTEMS MAINTENANCE) To verify possible required dry system modifications of sprinkler head coverage on the Level One (underside) Connecting Bridge which will have the existing ceiling/soffit removed. To remove all fire sprinkler protection in the entire existing 1 story McCleary Conference Center, Lobby and Gift Shop. To remove existing FDC connection with piping and reroute connection to the East Lobby FDC location. To remove all pendants and armovers in the Level Two Connecting Bridge (both ends), and maintain the shell along with the rated corridor pendant protection. The building permit addresses the new construction of 2-hour exit passageway to maintain a required exit system past new construction at two locations which is not specifically addressed under this permitted work scope. The fire sprinkler system work shall be maintained in accordance with minimum requirements of NFPA 13-2002, complying with the IFC-2000 and attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this permit, to provide witness of compliance verification of meeting minimum code. This permit is attached to building permit: BLD04-00448.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/27/20049/27/20049/27/2004PPASS
DetailsTroy Cobbley
Sprinklers match plan except for one area on the bridge was not demo'd. It is being used for Macarthys office.
DOC - Permit Finaled9/27/20049/27/20049/27/2004PPASS
DetailsTroy Cobbley
Finaled by inspector at 9/27/2004 2:56:51 PM
INSP-Final Inspection9/27/20049/27/20049/27/2004PPASS
DetailsTroy Cobbley
Sprinklers match plan except for one area on the bridge was not demo'd. It is being used for Macarthys office.
DOC - Permit Finaled9/27/20049/27/20049/27/2004PPASS
DetailsTroy Cobbley
Finaled by inspector at 9/27/2004 2:56:51 PM
INSP-Sprinkler Rough-in/Hydro7/8/20047/9/20047/9/2004APART
DetailsTroy Cobbley
Inspection was for the temporary rated corridor on the 1st floor, north side of the south tower. Sprinkler piping is ok to cover. Approximately 6 sprinkler pendants 7/9/2004 10:04:41 AM
Plan assigned to (Bill)4/19/2004 4/26/2004 DONE
Sprinkler Plan Check4/20/2004 4/26/2004 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  4/26/2004 DONE
Inspection Record Card- Fire4/26/2004 4/26/2004 DONE
Permit Ready to Issue  4/26/2004 DONE
Telephone call  4/26/2004 DONE
spoke with Brodey -- permit is ready.
Issue and Print Permit  4/26/2004 DONE
Application received  4/19/2004