INSP-Final Inspection | 10/13/2004 | 10/13/2004 | 10/13/2004 | P | PASS |
Troy Cobbley
|
|
|
finaled 10/13/2004 2:15:30 PM
|
DOC - Permit Finaled | 10/13/2004 | 10/13/2004 | 10/13/2004 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 10/13/2004 2:15:34 PM
|
INSP-Final Inspection | 10/7/2004 | 10/7/2004 | 10/7/2004 | P | FAIL |
Troy Cobbley
|
|
|
New a/v has been removed but now there is a trouble on nac circuit 2 area E 10/7/2004 4:24:36 PM
|
INSP-Conference | 10/4/2004 | 10/5/2004 | 10/5/2004 | P | CANC |
Troy Cobbley
|
|
|
Work is not complete yet per Rob 10/5/2004 3:01:29 PM
|
CHANGE STATUS TO (ISS) | | | 10/4/2004 | | DONE |
|
|
|
|
Alarm Plan Check | | | 9/30/2004 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/30/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/30/2004 | | 9/30/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/30/2004 | | DONE |
|
|
|
Spoke with Rob and told him that permit is ready & no fees///9/30/04 10:06am BAS
|
Plan resubmittals received | | | 9/29/2004 | | DONE |
|
|
|
Received a copy of the existing second floor corridor H/S locations. The new set of double doors are glass and if there is sufficient coverage from the existing appliances, there will be no FA modifications required in the corridor.
|
INSP-Conference | 8/26/2004 | 8/27/2004 | 8/26/2004 | P | CANC |
Troy Cobbley
|
|
|
This is Robs Cell number; Phone #: ###-#### Internet Inspection Request from: Terry Owsley Inspection cancelled from web by: Terry Owsley
|
Telephone call | | | 8/10/2004 | | DONE |
|
|
|
Spoke with Marv Merkel (Eidam). The panel was designed and installed areound 1###-####. NFPA 72 (93) does not have a requirement for sychronization, but does have a requirement for the temporal audiblity. The remodeled spaces were reviewed under NFPA 72 2002 which require sychronization and temporal alarming. The request is the affected areas should be brought up to code, it this is not possible (panel does not support it, etc.) a letter from Marv would surfice explaining the non-conformance, and include all pertinent information such as the panel manufacturer and model.
|
INSP-Final Inspection | 7/27/2004 | 7/28/2004 | 7/28/2004 | P | FAIL |
Troy Cobbley
|
|
|
Syncronize strobes. See review note #7. Provide temporal for horns. See review note #6. Provide map for the facp per review note #3. 7/28/2004 4:07:10 PM
|
INSP-Final Inspection | 7/27/2004 | 7/28/2004 | 7/27/2004 | A | CANC |
Troy Cobbley
|
|
|
Please Call the office one hour befor inspection if possiable. Thank you Terry; Phone #: ###-#### Internet Inspection Request from: Terry Owsley Inspection cancelled from web by: Terry Owsley
|
Issue and Print Permit | | | 5/14/2004 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 4/27/2004 | | 5/12/2004 | | DONE |
|
|
|
|
Alarm Plan Check | | | 5/12/2004 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/12/2004 | | 5/12/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/12/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/12/2004 | | DONE |
|
|
|
permit ready and fee due
|
Miscellaneous action | | | 5/4/2004 | | DONE |
|
|
|
Request from Terry (Protex) to have plans left at front desk so she can insert the requested information.
|
Telephone call | | | 5/3/2004 | | DONE |
|
|
|
Left a message requesting the BLDG permit #.
|
Miscellaneous action | | | 5/3/2004 | | DONE |
|
|
|
Faxed request for additional information. Bldg permit #, site plan and additional application information that was not included on the original application.
|
Application received | | | 4/27/2004 | | |
|
|
|
|