Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR04-00300
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 123 S AUTO DR
Project NameSPR CALVARY CHAPEL CLASSROOMS
Customer Number 
ePlanReview 
Description
CALVARY CHAPEL CHURCH CLASSROOMS * To extend an existing dry pipe system from the existing main building through a 6,459-ft/2 addition to an existing 4, 574-ft/2 one story Type V-B building, to create new church classrooms and a new bookstore. This facility will be fully fire sprinklered and have a fire alarms system installed. Fire sprinklers are used for area increase. The fire sprinkler system work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-02403.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled9/23/20049/23/20049/23/2004PPASS
DetailsTroy Cobbley
Finaled by inspector at 9/23/2004 12:14:12 PM
INSP-Final Inspection9/23/20049/23/20049/23/2004PPASS
DetailsTroy Cobbley
fire sprinkler finaled
INSP-Sprinkler Rough-in/Hydro8/26/20048/27/20048/27/2004PPASS
DetailsTroy Cobbley
24 hour air test passed 8/27/2004 2:04:10 PM
INSP-Sprinkler Rough-in/Hydro8/25/20048/26/20048/26/2004APASS
DetailsTroy Cobbley
200 lbs hydro test has passed. Started the 24 hour air test at 3:00 with 48psi on the gauge 8/26/2004 3:21:26 PM
INSP-Sprinkler Rough-in8/24/20048/25/20048/25/2004APASS
DetailsTroy Cobbley
Sprinkler piping is ok to cover. Contractor does not have the dry pendants yet. Temporary pendants installed for now. Eric and I spoke about modifications to the connection between the new system and the old. I verified with Bill this minor modification would not require submittals. 8/25/2004 11:23:46 AM
INSP-Sprinkler Rough-in7/15/20047/15/20047/15/2004PPASS
DetailsTroy Cobbley
Sprinkler piping above the hard lid areas are ok for cover. I also looked at the main and branchline sizing, hangers and earthquake bracing. They are ok as well. Sprig ups, drops and return bends have not been inspected since not all work is complete. 7/15/2004 2:33:21 PM
CHANGE STATUS TO (ISS)  7/15/2004 DONE
already pd previously
Plan assigned to (Bill)7/13/2004 7/14/2004 DONE
Sprinkler Plan Check7/13/2004 7/14/2004 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  7/14/2004 DONE
Override - Parcel Holds  7/14/2004  
Inspection Record Card- Fire7/14/2004 7/14/2004 DONE
Override - Parcel Holds  7/14/2004  
Permit Ready to Issue  7/14/2004 DONE
Telephone call  7/14/2004 DONE
permit ready and fee due
Plan resubmittals received  7/13/2004  
Issue and Print Permit  6/21/2004 DONE
Plan assigned to (Bill)5/19/2004 6/18/2004 DONE
Sprinkler Plan Check6/10/2004 6/18/2004 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  6/18/2004 DONE
Inspection Record Card- Fire6/18/2004 6/18/2004 DONE
Permit Ready to Issue  6/18/2004 DONE
Telephone call  6/18/2004 DONE
left mess that permit is ready
Plan resubmittals received  6/10/2004  
Sprinkler Plan Check5/21/2004 5/21/2004 FAIL
Details
Partial review done. Plans denied. Comments faxed to contractor.
Application received  5/19/2004