INSP-Final Inspection | 6/3/2005 | 6/3/2005 | 6/3/2005 | P | PASS |
Troy Cobbley
|
|
|
fire sprinkler finaled
|
INSP-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 | P | FAIL |
Troy Cobbley
|
|
|
Need to meet review note #1, need head wrench and forward flush
|
INSP-Final Inspection | 5/31/2005 | 5/31/2005 | 5/31/2005 | P | FAIL |
Troy Cobbley
|
|
|
need approved plans on site for the shell system and the corrections noted on 12/3/2004 corrected.
|
INSP-Sprinkler Rough-in/Hydro | 12/10/2004 | 12/13/2004 | 12/13/2004 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed 12/13/2004 12:36:18 PM
|
INSP-Sprinkler Rough-in/Hydro | 12/8/2004 | 12/9/2004 | 12/9/2004 | P | FAIL |
Troy Cobbley
|
|
|
Overhead hydro test failed. See approved plans for locations of puddles and for locations of missing retaining straps. Fire dept connection does meet the requirements of review note #1. Per plans central ty6137 upright were to be installed. But Gem F895 ECOH uprights have been installed. There are no sidewall heads in the head box to verify if correct. The riser room is required to be one hour rated. There are several holes in the wall and around piping penatrations that need taken care of. Provide verification of review note #68 for single truss supporting main. Need head wrenches and nfpa 25 for head box at final. Need certification of the backflow preventor, forward flush and fire alarm supervision at final. 12/9/2004 1:44:09 PM
|
INSP-Sprinkler Rough-in/Hydro | 12/6/2004 | 12/7/2004 | 12/7/2004 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed 12/7/2004 2:12:17 PM
|
INSP-Supply line flush | 12/6/2004 | 12/6/2004 | 12/6/2004 | P | PART |
Troy Cobbley
|
|
|
Underground flush passed. Hydro test of the underground supply piping failed. 12/6/2004 3:26:38 PM
|
INSP-Supply line flush | 12/6/2004 | 12/6/2004 | 12/6/2004 | P | PART |
Troy Cobbley
|
|
|
Underground flush passed. Hydro test of the underground supply piping failed. 12/6/2004 3:26:38 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/16/2004 | 9/17/2004 | 9/17/2004 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover. Taps have not been made yet. 9/17/2004 4:30:10 PM
|
Sprinkler Plan Check | 7/23/2004 | | 7/26/2004 | | PASS |
Bill Alexander
|
|
|
Underground size change.
|
Miscellaneous action | | | 7/26/2004 | | DONE |
|
|
|
Plan change #1 returned to permit desk for calling and returning-approved.
|
Inspection Record Card- Fire | 7/26/2004 | | 7/26/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/26/2004 | | DONE |
|
|
|
resub permit ready
|
INSP-Sprinkler Rough-in | 7/22/2004 | 7/23/2004 | 7/23/2004 | A | PART |
Troy Cobbley
|
|
|
Inspection was for stub-out only. Plans show 8" but 6" was installed. Per conversation with Bill Alexander 6" will be OK as long as this is supported with revised hydraulic calculations. Stub-out is OK to bury. 7/23/2004 12:24:58 PM
|
Plan resubmittals received | | | 7/23/2004 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/6/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 6/30/2004 | | 7/2/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/2/2004 | | 7/2/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/2/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/2/2004 | | DONE |
|
|
|
spoke with Don -- permit is ready.
|
Sprinkler Plan Check | 7/1/2004 | | 7/1/2004 | | PASS |
Bill Alexander
|
|
|
|
Application received | | | 6/30/2004 | | |
|
|
|
|