INSP-Sprinkler Rough-in/Hydro | 11/10/2004 | 11/12/2004 | 11/12/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinkler finaled 11/12/2004 12:49:55 PM
|
DOC - Permit Finaled | 11/12/2004 | 11/12/2004 | 11/12/2004 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 11/12/2004 12:50:13 PM
|
INSP-Conference | 11/3/2004 | 11/4/2004 | 11/4/2004 | P | CANC |
Troy Cobbley
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 9/16/2004 | 9/17/2004 | 9/17/2004 | A | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover. Taps have not been made yet. 9/17/2004 4:30:04 PM
|
Sprinkler Plan Check | 7/23/2004 | | 7/26/2004 | | PASS |
Bill Alexander
|
|
|
Underground size change.
|
Miscellaneous action | | | 7/26/2004 | | DONE |
|
|
|
Plan change #1 returned to permit desk for calling and returning-approved.
|
Inspection Record Card- Fire | 7/26/2004 | | 7/26/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/26/2004 | | DONE |
|
|
|
resub permit ready
|
INSP-Sprinkler Rough-in | 7/22/2004 | 7/23/2004 | 7/23/2004 | A | PART |
Troy Cobbley
|
|
|
Inspection was for stub-out only. Plans show 8" but 6" was installed. Per conversation with Bill Alexander 6" will be OK as long as this is supported with revised hydraulic calculations. Stub-out is OK to bury. 7/23/2004 12:24:51 PM
|
Plan resubmittals received | | | 7/23/2004 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/6/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 7/1/2004 | | 7/2/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/2/2004 | | 7/2/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/2/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/2/2004 | | DONE |
|
|
|
spoke with Don -- permit is ready.
|
Sprinkler Plan Check | 7/1/2004 | | 7/1/2004 | | PASS |
Bill Alexander
|
|
|
|
Application received | | | 7/1/2004 | | |
|
|
|
|