INSP-Final Inspection | 8/2/2004 | 8/3/2004 | 8/3/2004 | A | PASS |
Troy Cobbley
|
|
|
fire alarm finaled 8/3/2004 1:29:58 PM
|
DOC - Permit Finaled | 8/3/2004 | 8/3/2004 | 8/3/2004 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 8/3/2004 1:30:04 PM
|
Issue and Print Permit | | | 7/23/2004 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 7/2/2004 | | 7/20/2004 | | DONE |
|
|
|
|
Alarm Plan Check | | | 7/20/2004 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/20/2004 | | DONE |
|
|
|
Received revised matrix via fax.
|
Inspection Record Card- Fire | 7/20/2004 | | 7/20/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/20/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/20/2004 | | DONE |
|
|
|
left message with secretary Teresa
|
Telephone call | | | 7/12/2004 | | DONE |
|
|
|
To Brandon at Farren Engineers. The FACP is an addressable panel. No addresses are shown on either the riser or the plans. I will accept red-line drawings for final with the addresses red-lined on the riser and the plans. Brandon will be down today.
|
Telephone call | | | 7/9/2004 | | DONE |
|
|
|
Left a message for Charile Bayne, (Simplex) to please forward a fire alarm matrix for this submittal.
|
Application received | | | 7/2/2004 | | |
|
|
|
|