Case Summary | | | 5/25/2005 | | DONE |
|
|
|
|
INSP-Final Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 | A | PASS |
Troy Cobbley
|
|
|
fire alarm finaled
|
DOC - Permit Finaled | 9/24/2004 | 9/24/2004 | 9/24/2004 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 9/24/2004 10:22:40 AM
|
INSP-Final Inspection | 9/9/2004 | 9/10/2004 | 9/10/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide updated map for the facp. Provide signage on facp room door. Provide knox box with key and map to facp room 9/10/2004 12:42:22 PM
|
INSP-Final Inspection | 9/7/2004 | 9/9/2004 | 9/9/2004 | P | CANC |
Troy Cobbley
|
|
|
Rescheduled for tomorrow morning 9/9/2004 2:50:46 PM
|
Inspection Record Card- Fire | 9/1/2004 | | 9/1/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/1/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/1/2004 | | DONE |
|
|
|
permit ready and fee due
|
Issue permit | | | 9/1/2004 | | DONE |
|
|
|
|
Alarm Plan Check | 8/31/2004 | | 8/31/2004 | | PASS |
|
|
|
Plan Modification. Addition of security access doors. Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/30/2004 | | |
|
|
|
|
Alarm Plan Check | | | 8/26/2004 | | FAIL |
|
|
|
Security devices are being added. A resubmittal is required. Apparently the HVAC duct detector locations have changed. I called Nick (Synergy) and requested that he resubmit the plans that include the security devices and any HVAC duct detector changes. I told him we would include it with the panel (plan modification dated 8/23/04) and assume we had one resubmittal. Therefore the plans are on hold pending a resubmittal of revised plans.
|
Plan resubmittals received | | | 8/26/2004 | | DONE |
|
|
|
Plan Modification. Upgrade of FA panel was required as the original would not function.
|
INSP-Conference | 7/27/2004 | 7/27/2004 | 7/27/2004 | A | DONE |
Troy Cobbley
|
|
|
There are card readers and door magnets being installed. I contacted Nick with Synergy and Jason with AEI about IFC and IBC requirements for access controlled egress doors. These items are not shown on the approved fire alarm plans. Plans will require possible resubmittals.
|
INSP-Conference | 7/22/2004 | 7/22/2004 | 7/22/2004 | P | DONE |
Troy Cobbley
|
|
|
Met with tim, superintendant, and a representative from the mechanical and fire alarm contractors. We discussed the removal of a duct smoke detector that was not needed in the Training room. The hvac unit is 1800cfm and serves only that room. I agreed with the removal 7/22/2004 3:48:31 PM
|
Issue and Print Permit | | | 7/20/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/19/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/19/2004 | | 7/19/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/19/2004 | | DONE |
|
|
|
Spoke with Kurt and told him that permit is ready & fees///7/19/04 BAM
|
Alarm Plan Check | | | 7/16/2004 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/16/2004 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 7/7/2004 | | 7/16/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/13/2004 | | DONE |
|
|
|
Spoke with Kurt Lechtenberg at Synergy. Requested FACP panel battery charging capacity, maximum size batteries in panel. Required a cut sheet for the dual phone supervising module as well as a revised battery calcs including the dual phone supervising module.
|
Plan resubmittals received | | | 7/12/2004 | | DONE |
|
|
|
Received demo portion of the job.
|
Telephone call | | | 7/8/2004 | | DONE |
|
|
|
Spoke with Nick Schafer at Synergy. They want to demo the entire system and use the existing FACP to monitor the duct detectors. I stated he needed to verfy and show that the system was not required when it was installed. Then a demo plan, showing all locations will be required so the inspector can verify all components are removed. He stated he would work on it.
|
Application received | | | 7/7/2004 | | |
|
|
|
|