Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR04-00429
StatusFinaled
Name IDAHO FIRE PROTECTION
Site Address 2323 S VISTA AVE Unit: 100
Project NameSPR FIRST HORIZON HOME LOAN
Customer Number 
ePlanReview 
Description
(FIRST HORIZON HOME LOAN)(VISTA/TARGEE-BLDG A - STE 100) To add one and relocate 12 existing fire sprinklers for the new 2,503-ft/2 expansion to an existing 3,025-ft.2 office tenant in the northeast corner of the first floor of existing building. New area total for the tenant will be 5,528-ft/2. Fire sprinkler work is related to miscellaneous interior demolition work, new interior walls, and some suspended ceiling work. This permit is being done in conjunction with the adjacent suite remodel permit under BLD04-01339 (no fire permit to date) and both permits are attached to the same set of building plans. This building is fully sprinklered for allowable area increase. The fire sprinkler system work shall comply with IFC 2000, attached review comment and conditions list, as regulated by the Fire Chief. The permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD04-01338.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in/Hydro9/29/20049/29/20049/29/2004PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/29/2004 at 10:59:04 AM. Contact: ###-####.
DOC - Permit Finaled9/29/20049/29/20049/29/2004PPASS
DetailsRick Jackson
Finaled by inspector at 9/29/2004 2:27:24 PM
INSP-Sprinkler Rough-in/Hydro9/23/20049/23/20049/23/2004PPART
DetailsTroy Cobbley
sprinkler piping is ok to cover but in areas where two pendant heads are supplied from the same 1" outlet the piping needs to be modified for one outlet, one pendant 9/23/2004 4:00:04 PM
INSP-Sprinkler Rough-in/Hydro8/9/20048/10/20048/10/2004APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 8/9/2004 at 12:03:35 PM. Contact: ###-####. Phased project - Phase one okay for cover 8/10/2004 12:07:19 PM
Issue and Print Permit  7/30/2004 DONE
Plan assigned to (Bill)7/22/2004 7/23/2004 DONE
Sprinkler Plan Check7/22/2004 7/23/2004 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  7/23/2004 DONE
Case Summary  7/23/2004 DONE
Inspection Record Card- Fire7/23/2004 7/23/2004 DONE
Permit Ready to Issue  7/23/2004 DONE
Telephone call  7/23/2004 DONE
permit reaady and fee due
Application received  7/22/2004