Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR04-00448
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 1322 W IDAHO ST
Project NameSPR MEADOW GOLD BLDG C, D, E
Customer Number 
ePlanReview 
Description
MEADOW GOLD DAIRY WAREHOUSE "D", WAREHOUSE "C" AND MILK RECEIVING BAY - To install an overhead fire sprinkler system for High Piled Combustible Storage in a new 7,921-ft/2 one story, Type VB warehouse addition attached to an existing 4,640-ft/2 warehouse and a 1,250-ft/2 milk receiving bay. Building "D" will have high rack storage. Building "C" will have palletized/pile storage. Building "C", "D" and "E" are considered as one building due to lack of approved fire barriers, with fire sprinklers used for area. The fire sprinkler system work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. The underground fire permit associated with project is: FIR04-00432. This permit is attached to building permit: BLD04-0702.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/27/20051/28/20051/28/2005PPASS
DetailsRick Jackson
Contact: Vance - Needs around 2 PM - please call to confirm.; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley UG riser has been corrected to allow heat to base of UG at sidewalk level; dry uprights installed 1/28/2005 2:06:15 PM
DOC - Permit Finaled1/28/20051/28/20051/28/2005PPASS
DetailsRick Jackson
Finaled by inspector at 1/28/2005 2:06:19 PM
INSP-Sprinkler Rough-in/Hydro1/3/20051/4/20051/4/2005PPART
DetailsRick Jackson
1:00 pm; will need to check flows for alarms at fire panel R/I okay; will need to complete dry uprights for final; UG will need heat per resubmittals; need resubmittals for changes to riser and racking 1/4/2005 2:48:19 PM
INSP-Sprinkler Rough-in1/3/20051/3/20051/3/2005PFAIL
DetailsRick Jackson
Contact: Vance - Walt thru - would like around 1:30 PM - please call to confirm; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Flow switch on east riser not operating properly 1/3/2005 2:57:29 PM
INSP-Sprinkler Rough-in/Hydro12/30/200412/30/200412/30/2004PPART
DetailsRick Jackson
Contact: vance; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Hydro okay; will do the r/i on 1/3; all control valves locked open; system not supervised 12/30/2004 5:06:24 PM
INSP-Final Inspection12/30/200412/30/200412/30/2004PPART
DetailsRick Jackson
contact: vance; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Hydro okay; will do r/i on 1/3; all control valves locked open; system not supervised 12/30/2004 5:05:41 PM
INSP-Sprinkler Rough-in12/30/200412/30/200412/30/2004PPART
DetailsRick Jackson
Contact: Vance - Hydro for 1 pm; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Hydro okay; will do r/i on 1/3; all control valves locked open; system not supervised 12/30/2004 5:05:57 PM
FIR-Aging Inspection12/24/200412/24/200412/27/2004 PART
DetailsRick Jackson
Still under construction 12/27/2004 10:41:02 AM
Issue and Print Permit  9/24/2004 DONE
Permit Ready to Issue  9/23/2004 DONE
Inspection Record Card- Fire9/23/2004 9/23/2004 DONE
Telephone call  9/23/2004 DONE
Spoke with Alisha and told her that permit is ready & fees///9/23/04 2:20pm BAS
Sprinkler Plan Check9/10/2004 9/22/2004 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  9/22/2004 DONE
Plan resubmittals received  9/10/2004 DONE
Plan assigned to (Bill)7/29/2004 8/11/2004 DONE
Sprinkler Plan Check8/9/2004 8/11/2004 PART
DetailsBill Alexander
Resubmittal required.
1. Plan FP4 of 4. Provide complete data submittals on Dry Uprights installing in Warehouse "C". Include the maximum dimension installing. Include the number installing in the "Sprinkler Schedule." NOTE: Partial section on same sheet scales in excess of 4'-0" of upright required. Maximum listed approval length ("B" dimensioning) is 49½". Any length exceeding this length will not be allowed. (4'-0" is the industry standard for maximum listing). Another issue is sprig-ups 4 ft or longer shall be restrained against lateral movement. (NFPA 13:9.3.6.5*, 9.3.5.5)

2. Provide data submittal of the listed water shields installing. (NFPA 13:8.5.5.3.3)

3. Sprinklers in single row "D.1" racks do not meet the location requirements addressed and shown in 12.3.3.1.5(f). Revise and resubmit.

4. Milk Receiving Bay has an area where sprinkler head spacing exceeds the design verified. Revise and resubmit.

5. Building "C" calculations address a remote area of 1025-ft/2 and not 1,500 (minimum required)? Revise and resubmit. Note: Q.R. Reduction allowance does not apply to Chapter 12 "Storage."
PLANS/APPL TAKEN TO FRONT DESK  8/11/2004 DONE
DetailsBill Alexander
Inspection Record Card- Fire8/11/2004 8/11/2004 DONE
Permit Ready to Issue  8/11/2004 DONE
Telephone call  8/11/2004 DONE
left a message for John -- permit is ready.
Issue and Print Permit  8/11/2004 DONE
Plan resubmittals received  8/6/2004 DONE
Sprinkler Plan Check7/29/2004 8/2/2004 FAIL
DetailsBill Alexander
The data has been moved to a Word document attached to this case.
Miscellaneous action  8/2/2004 DONE
Returned failed plans to permit desk for returning.
Telephone call  8/2/2004 DONE
Spoke with Alisha and told her that plans failed and need picked up///8/2/04 11:10am BAM
Application received  7/29/2004