INSP-Final Inspection | 11/12/2004 | 11/12/2004 | 11/12/2004 | P | PASS |
Rick Jackson
|
|
|
|
DOC - Permit Finaled | 11/12/2004 | 11/12/2004 | 11/12/2004 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 11/12/2004 2:47:25 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/13/2004 | 10/14/2004 | 10/14/2004 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/13/2004 at 2:30:54 PM. Contact: ###-####. Hdro okay ; will close out this permit final 10/14/2004 11:51:33 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/13/2004 | 10/13/2004 | 10/13/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/13/2004 at 8:44:27 AM. Contact: ###-####. Okay to cover 10/13/2004 3:40:51 PM
|
Plan assigned to (Bill) | 9/30/2004 | | 10/11/2004 | | DONE |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/30/2004 | | 10/11/2004 | | PASS |
Bill Alexander
|
|
|
|
Permit Ready to Issue | | | 10/11/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/11/2004 | | 10/11/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/11/2004 | | DONE |
|
|
|
Spoke with Tom and told him permit is ready & fees///10/11/04 1:35pm BAS
|
Issue and Print Permit | | | 10/11/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/30/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/14/2004 | | 9/27/2004 | | PART |
Bill Alexander
|
|
|
Need plan corrections.
|
Miscellaneous action | | | 9/27/2004 | | DONE |
|
|
|
Took partially approved plans to permit desk for calling and returning.
|
Inspection Record Card- Fire | 9/27/2004 | | 9/27/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/14/2004 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/13/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 8/6/2004 | | 8/9/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/6/2004 | | 8/9/2004 | | PART |
Bill Alexander
|
|
|
Third floor has a "Horizontal Exit". Class I system standpipe shall be provided with 2½" hose connections on each side of the wall, adjacent to the exit openings of horizontal exits. Provide corrected resubmitted plans incorporating this requirement for verification and approval. (IFC 905.4(2), NFPA 14:7.3.2*)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/9/2004 | | 8/9/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/9/2004 | | |
|
|
|
|
Telephone call | | | 8/9/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Application received | | | 8/6/2004 | | |
|
|
|
|