INSP-Final Inspection | 3/29/2010 | 3/30/2010 | 3/30/2010 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work final approved, on site inspection passed- documents okayed. Sytem riser is current with the required annual inspection tag.
|
Miscellaneous action | | | 3/12/2010 | | DONE |
|
|
|
Sent email requesting project status.
|
FIR-Aging Inspection | 11/10/2004 | 11/10/2004 | 11/10/2004 | | PART |
Rick Jackson
|
|
|
Talked to Tom and he will look into this and schedule for an inspection 11/10/2004 10:52:26 AM
|
Application received | | | 8/11/2004 | | |
|
|
|
|
Plan assigned to (Bill) | 8/11/2004 | | 8/11/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/11/2004 | | 8/11/2004 | | PASS |
Bill Alexander
|
|
|
|
Telephone call | | | 8/11/2004 | | DONE |
|
|
|
11:40 AM. Requested information from designer:
Why is the ceiling being removed? Do you know the occupancy hazard, etc?
Designer did not use the T.I. Cover Sheet addressing some minimum issues which facilitate in verifying minimum fire code issues.
Faxed a copy of the "T.I. Cover Sheet" which should help in relaying to me fire code requirements.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2004 | | DONE |
|
|
|
|
Case Summary | | | 8/11/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/11/2004 | | 8/11/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/11/2004 | | DONE |
|
|
|
|
Telephone call | | | 8/11/2004 | | DONE |
|
|
|
left a message for John -- permit is ready.
|
Issue permit | | | 8/11/2004 | | DONE |
|
|
|
|