INSP-Final Inspection | 3/22/2006 | 3/22/2006 | 3/22/2006 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Supply line flush | 6/30/2005 | 6/30/2005 | 6/30/2005 | P | PART |
Forrest France
|
|
|
UG flush was performed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 6/30/2005 | 6/30/2005 | 6/30/2005 | P | PART |
Forrest France
|
|
|
UG hydro test and flush performed satisfactory.
|
INSP-Sprinkler Rough-in | 4/7/2005 | 4/7/2005 | 4/7/2005 | P | PASS |
Forrest France
|
|
|
Underground supply piping is ok to cover
|
Issue and Print Permit | | | 4/6/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 8/18/2004 | | 4/4/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/29/2005 | | 4/4/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/4/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/4/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/4/2005 | | 4/4/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/4/2005 | | DONE |
|
|
|
Spoke with Hope and left message with her for Jeff that permit is ready & fees///4/4/05 4:45pm BAS
|
Plan resubmittals received | | | 3/29/2005 | | |
Bill Alexander
|
|
|
|
Application received | | | 8/18/2004 | | |
|
|
|
|
Miscellaneous action | | | 8/18/2004 | | DONE |
|
|
|
Emailed this date a letter to Brodie Stenquist that fire sprinkler review cannot be provided until the BLD plans have been approved.
|