Permit VOIDED | | | 2/7/2005 | | DONE |
|
|
|
Received written request from Keith Olstrom (Vanguard Protection Group, Business Manager, applicant on this permit) to void this permit.
|
Case Summary | | | 2/7/2005 | | DONE |
|
|
|
|
FIR-Aging Inspection | 1/24/2005 | 1/24/2005 | 1/24/2005 | | NR |
Troy Cobbley
|
|
|
work in progress 1/24/2005 1:13:09 PM
|
Issue and Print Permit | | | 10/25/2004 | | DONE |
|
|
|
|
Alarm Plan Check | | | 9/29/2004 | | PASS |
|
|
|
Plan Modification. Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/29/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/29/2004 | | DONE |
|
|
|
Called Mark to let him know that permit is ready to be picked up and fee is free
|
Inspection Record Card- Fire | 9/29/2004 | | 9/29/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/15/2004 | | |
|
|
|
|
Plan assigned to (Mary) | 8/31/2004 | | 9/7/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/7/2004 | | |
|
|
|
Stephanie brought in the revised riser.
|
Plan resubmittals received | | | 9/7/2004 | | DONE |
|
|
|
Discussion with Stepahie, would it be possible to get large copies of the riser. She will bring them by
|
Alarm Plan Check | | | 9/7/2004 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/7/2004 | | DONE |
|
|
|
Spoke with Keith and told him that permit is ready & fees///9/7/04 12:00pm BAS
|
Permit Ready to Issue | | | 9/7/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/7/2004 | | 9/7/2004 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/7/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/3/2004 | | DONE |
|
|
|
Phone discussion with Stephanie Cobbley (CSHQA- FA designer) 1) the backflow tampers need to annunciate separately
2) Need to monitro elevator control voltage
3) Question as to whether the ARM is rated for the circuits (FSDs)
4) Fireman's hat needs to be added to the matrix
5) Battery charging capacity and maximum size of battery in the panel.
|
Plan resubmittals received | | | 9/3/2004 | | DONE |
|
|
|
Received revised FACP and sounder base battery calculations. Received a revised .pdf of the riser. Received a revised matrix.
|
Application received | | | 8/31/2004 | | |
|
|
|
|