INSP-Final Inspection | 3/22/2005 | 3/22/2005 | 3/22/2005 | P | PASS |
Troy Cobbley
|
|
|
fire sprinkler finaled
|
DOC - Permit Finaled | 3/22/2005 | 3/22/2005 | 3/22/2005 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 3/22/2005 12:58:38 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/4/2004 | 10/4/2004 | 10/4/2004 | P | FAIL |
Troy Cobbley
|
|
|
Sprinkler pendant deflector in mens restroom is bent. Replace head.
|
INSP-Final Inspection | 10/4/2004 | 10/4/2004 | 10/4/2004 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave millers and teresa's permission until the fire alarm and fire sprinklering of the outside canopies have been finished
|
INSP-Sprinkler Rough-in/Hydro | 9/30/2004 | 9/30/2004 | 9/30/2004 | P | CANC |
Troy Cobbley
|
|
|
No inspections per boise fire dept until upgrade agreements for the fire alarm and fire sprinklering of the canopies has been worked out. See building permit history. 9/30/2004 2:57:32 PM
|
CHANGE STATUS TO (ISS) | | | 9/9/2004 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/9/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/7/2004 | | 9/7/2004 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/7/2004 | | DONE |
|
|
|
accidently issued and changed backed to ready status - 9/7/2004 cmc
|
Telephone call | | | 9/7/2004 | | DONE |
|
|
|
called and talked to Tom D. regarding permit is ready and the fee
|
Permit Ready to Issue | | | 9/7/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 9/2/2004 | | 9/3/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/2/2004 | | 9/3/2004 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/3/2004 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 9/2/2004 | | |
|
|
|
|