Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR04-00546
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 3430 N MAPLE GROVE RD
Project NameSPR KING OF GLORY LUTHERAN CH.
Customer Number 
ePlanReview 
Description
KING OF GLORY LUTHERAN CHURCH (ADDITION) - To install underground supply and overhead fire sprinkler system. Underground is installing approximately 129'-0" of 6", C-900 PVC, from the property line in North Maple Grove, east to a 6" M.J. ell, then south approximately 38'-0", under the footing to a 6" M.J. ell and up through the floor with 6" Ductile Iron approximately 6" above the finish floor. Also to install a complete overhead light hazard occupancy system throughout the entire existing and new 6,028-ft/2 one story, Type VB structure. Fire sprinklers are used for construction type area. The fire sprinkler system (overhead and underground) work shall comply with the IFC 2000, the attached review comments/conditions, all regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-03027.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/3/20052/4/20052/4/2005APASS
DetailsTroy Cobbley
Fire sprinkler finaled 2/4/2005 9:56:59 AM
DOC - Permit Finaled2/4/20052/4/20052/4/2005APASS
DetailsTroy Cobbley
Finaled by inspector at 2/4/2005 9:57:02 AM
INSP-Final Inspection1/28/20051/28/20051/28/2005PFAIL
DetailsRick Jackson
OH hydro okay; flow switch not working properly - cycles; forward flow of BFP okay 1/28/2005 1:08:42 PM
INSP-Supply line flush1/26/20051/27/20051/27/2005ACANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 1/26/2005 at 3:34:50 PM. Contact: ###-####. UG has been hydro'd and flushed 1/27/2005 8:16:38 AM
INSP-Sprinkler Rough-in1/26/20051/27/20051/27/2005APART
DetailsRick Jackson
terrry - ###-#### Hydro failed; okay to cover areas identified on plans and resubmittals for beam areas 1/27/2005 10:45:23 AM
INSP-Sprinkler Rough-in/Hydro1/26/20051/27/20051/27/2005APART
DetailsRick Jackson
###-#### - terry Note: please call prior to inspection Hydro failed; okay to cover areas identified on plans and resubmittals for beam areas 1/27/2005 10:45:36 AM
INSP-Supply line flush12/20/200412/21/200412/21/2004PPASS
DetailsTroy Cobbley
Underground supply line flush passed 12/20/2004 3:21:27 PM
INSP-Sprinkler Rough-in/Hydro12/20/200412/21/200412/21/2004PPASS
DetailsTroy Cobbley
Underground hydro test passed 12/20/2004 3:20:51 PM
Issue and Print Permit  12/21/2004 DONE
INSP-Conference12/16/200412/16/200412/16/2004PPART
DetailsTroy Cobbley
Sanctuary piping rough-in is ok 12/16/2004 4:09:40 PM
Plan assigned to (Bill)12/14/2004 12/16/2004 DONE
DetailsBill Alexander
Sprinkler Plan Check12/14/2004 12/16/2004 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  12/16/2004 DONE
Inspection Record Card- Fire12/16/2004 12/16/2004 DONE
Permit Ready to Issue  12/16/2004 DONE
Telephone call  12/16/2004 DONE
tlk to secretary ###-#### that permit and fees are ready to be picked up
INSP-Conference12/13/200412/14/200412/14/2004APASS
DetailsTroy Cobbley
Sprinkler piping in the central corridor is ok to cover 12/14/2004 8:34:40 AM
Plan resubmittals received  12/14/2004 DONE
INSP-Sprinkler Rough-in12/9/200412/10/200412/10/2004APART
DetailsTroy Cobbley
Combustible concealed spaces as discussed down the main corridor and for the beams over the classrooms need to be filled with non-combustible insulation or add upright sprinklers 12/10/2004 12:10:05 PM
Telephone call  12/9/2004 DONE
tlk to jeff packaham that his permit and fees are ready to picked up
Issue permit  12/9/2004 DONE
Sprinkler Plan Check12/2/2004 12/9/2004 PASS
DetailsBill Alexander
Installation changes/modifications and corrections.
Plan assigned to (Bill)12/2/2004 12/9/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/9/2004 DONE
Inspection Record Card- Fire12/9/2004 12/9/2004 DONE
Permit Ready to Issue  12/9/2004 DONE
Plan resubmittals received  12/2/2004  
DetailsBill Alexander
INSP-Sprinkler Rough-in11/12/200411/15/200411/15/2004ACANC
DetailsTroy Cobbley
Per Russ with treasure valley fire 11/15/2004 8:06:08 AM
INSP-Sprinkler Rough-in/Hydro11/2/200411/3/200411/3/2004PPART
DetailsTroy Cobbley
Overhead sprinkler piping in the remodeled classrooms and the new wing is ok. A second inspection will be needed for piping to pendants. There a pipe sizes installed that do not match approved plans as well as pendants installed in areas not shown to have ceilings. Resubmit plans to city of boise for approval showing ceilings and actual pipe sizes 11/3/2004 4:14:13 PM
INSP-Sprinkler Rough-in/Hydro10/4/200410/4/200410/4/2004PPASS
DetailsTroy Cobbley
Sprinkler supply stub-in is ok to bury 10/4/2004 4:34:42 PM
Issue permit  9/28/2004 DONE
Plan assigned to (Bill)9/17/2004 9/27/2004 DONE
Sprinkler Plan Check9/17/2004 9/27/2004 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  9/27/2004 DONE
Permit Ready to Issue  9/27/2004 DONE
Inspection Record Card- Fire9/27/2004 9/27/2004 DONE
Telephone call  9/27/2004 DONE
Left Jeff a message that permit is ready & fees///9/27/04 4:05pm BAS
INSP-Sprinkler Rough-in/Hydro9/22/20049/22/20049/22/2004PPART
DetailsTroy Cobbley
Inspection was just for the underground. Piping is ok to bury from the tap to the curbing just outside of the building. 9/22/2004 4:11:44 PM
Plan resubmittals received  9/17/2004 DONE
DetailsBill Alexander
Permit Ready to Issue  9/16/2004 DONE
Inspection Record Card- Fire9/16/2004 9/16/2004 DONE
Telephone call  9/16/2004 DONE
left mess that permit is ready
Issue and Print Permit  9/16/2004 DONE
Plan assigned to (Bill)9/7/2004 9/15/2004 DONE
Sprinkler Plan Check9/7/2004 9/15/2004 PART
DetailsBill Alexander
Approved Underground Supply Only.
PLANS/APPL TAKEN TO FRONT DESK  9/15/2004 DONE
Application received  9/7/2004