LaSalle Boise Research Center (Shell Office Building) - To install a single, dedicated fire service supply main for a new 16,940-ft/2, one story, concrete tilt-up office shell building. This service will tap in LaSalle St. where the contractor will start at the property line and run approximately 74' with 6" DR-14 C-900 PVC, turn 90º west approximately 105' to another 90º, turn north and run approximately 97', then another 90º east approximately 25' under the building footing and up through the finish floor with Class 50 Ductile Iron to a M.J. Adapter. This is an underground permit only. Separate overhead system t permit will be required. This building will be fully fire sprinklered. The sprinklers will be used for area increase. This fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD04-00958.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIR-Aging Inspection3/17/20103/17/20103/17/2010 PASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection3/17/20103/17/20103/17/2010PPASS
DetailsTroy Cobbley
Permit finaled
Miscellaneous action  3/12/2010 DONE
Sent email requesting project status.
INSP-Final Inspection1/19/20051/19/20051/19/2005PCANC
DetailsTroy Cobbley
Could not locate the overhead permit via company permits. This is to verify new plans and final the sprinkler. OH and UG. Internet Inspection Request from: Trent Bice
Inspection Record Card- Fire10/26/2004 10/26/2004 DONE
Telephone call  10/26/2004  
Spoke with Don ans told him that permit is ready & no fees due///10/26/04 9:30am BAS
Sprinkler Plan Check10/13/2004 10/25/2004 PASS
Field Modification of underground routing.
Miscellaneous action  10/25/2004 DONE
Plans taken to Permit desk for returning.
INSP-Sprinkler Rough-in/Hydro10/20/200410/21/200410/21/2004APASS
DetailsTroy Cobbley
Underground supply hydro test passed 10/21/2004 12:15:53 PM
Plan resubmittals received  10/13/2004 DONE
INSP-Sprinkler Rough-in/Hydro10/6/200410/7/200410/7/2004ACANC
DetailsTroy Cobbley
Rescheduled for this afternoon 10/7/2004 9:05:28 AM
INSP-Sprinkler Rough-in/Hydro10/7/200410/7/200410/7/2004PPASS
DetailsTroy Cobbley
Underground supply piping is ok to cover 10/7/2004 4:26:42 PM
INSP-Sprinkler Rough-in/Hydro10/6/200410/6/200410/6/2004PCANC
DetailsTroy Cobbley
Jonathan is our foreman on site. Please call prior to arrival. We need this to be the last inspection of the day. We may not be ready till morning. So please call Jonathan before arriving. Thank you.; Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
INSP-Sprinkler Rough-in/Hydro10/6/200410/6/200410/6/2004PCANC
DetailsTroy Cobbley
Contractor is not ready 10/6/2004 4:02:38 PM
Issue and Print Permit  9/20/2004 DONE
Plan assigned to (Bill)9/8/2004 9/17/2004 DONE
Sprinkler Plan Check9/8/2004 9/17/2004 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  9/17/2004 DONE
Permit Ready to Issue  9/17/2004 DONE
Inspection Record Card- Fire9/17/2004 9/17/2004 DONE
Telephone call  9/17/2004 DONE
Spoke with Don and told him that permit is ready & fees///9/17/04 4:30pm BAS