INSP-Final Inspection | 3/17/2005 | 3/18/2005 | 3/18/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire alarm finaled. 3/18/2005 10:41:55 AM
|
DOC - Permit Finaled | 3/18/2005 | 3/18/2005 | 3/18/2005 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 3/18/2005 10:41:59 AM
|
INSP-Final Inspection | 10/8/2004 | 10/8/2004 | 10/8/2004 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave millers permission until the phone lines are installed and system tested. I received a copy of the work order giving L&K electric authorization to proceed with this work.
|
INSP-Final Inspection | 10/6/2004 | 10/6/2004 | 10/6/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide 14awg wire instead of 16awg as per plans. Provide verification on duct detector shutdown (plans). Plans show dual phone lines but there are no phone lines. There are sprinklers in the kitchen but actual head count is not known for possible sprinkler system monitoring 10/6/2004 3:17:38 PM
|
Inspection Record Card- Fire | 10/1/2004 | | 10/1/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/1/2004 | | |
|
|
|
|
Telephone call | | | 10/1/2004 | | DONE |
|
|
|
talked jason that his permit and fee is ready to be picked up
|
Issue permit | | | 10/1/2004 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 9/28/2004 | | 9/30/2004 | | DONE |
|
|
|
|
Alarm Plan Check | | | 9/30/2004 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
Telephone call | | | 9/30/2004 | | DONE |
|
|
|
Spoke to Jason Minnick, requested an revised matrix to show the cooking hood monitoring point as an alarm signal.
|
Miscellaneous action | | | 9/30/2004 | | DONE |
|
|
|
Received revised matrix via fax.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2004 | | DONE |
|
|
|
|
Application received | | | 9/28/2004 | | |
|
|
|
|