Permit Information
Permit NumberFIR04-00604
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 111 N CLOVERDALE RD
Project NameSPR FEDEX SHOP INSP BAY
Customer Number 
ePlanReview 
Description
FED EX FREIGHT SHOP INSPECTION BAY * To convert a 2,250-ft/2 area located on the north end of an existing 9,450-ft/2 one story (with 1,150 mezzanine) truck maintenance shop existing wet system into anti-freeze wet system. This bay is addressed as the truck inspection area. This building is fully fire sprinklered. The fire sprinkler system work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is not attached to any other permit.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/27/20057/27/20057/27/2005PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro11/29/200411/29/200411/29/2004PPASS
DetailsTroy Cobbley
Hydro test on the new antifreeze loop is ok. Sprinkler rough-in is ok. There are still items that need to be completed at the final such as forward flush and alarm connections. Piping size on plans as compared to hydraulic calculations does not match. Per bill alexander what has been installed is ok. 11/29/2004 3:09:18 PM
Issue and Print Permit  10/27/2004 DONE
Plan assigned to (Bill)9/30/2004 10/26/2004 DONE
Sprinkler Plan Check10/19/2004 10/26/2004 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  10/26/2004 DONE
Permit Ready to Issue  10/26/2004 DONE
Inspection Record Card- Fire10/26/2004 10/26/2004 DONE
Telephone call  10/26/2004 DONE
Left message that permit is ready & fees///10/26/04 4:00pm BAS
Plan resubmittals received  10/19/2004  
DetailsBill Alexander
Telephone call  10/14/2004 DONE
Left message with Julie that plans failed and need picked up///10/14/04 8:25am BAS
Sprinkler Plan Check10/13/2004 10/13/2004 FAIL
DetailsBill Alexander
1. The calculations provided do not verify that both backflow preventers were addressed completely? (Reference your calculation sheet #2). With the most demanding verified flow of 329-gpm required, the minimum pressure loss of 7+ lbs in the Ames Maxim and another 4 would be addressed in the risers Zurn Wilkins.

2. Designer shall include data submittals on the expansion chamber which shall be sized meeting an approved formula relating to the antifreeze systems capacity. A formula used and approved is addressed in A.7.5.3.2. (IFC 105.4)
Miscellaneous action  10/13/2004 DONE
Returned plans to the permit desk for returning and corrections.