INSP-Final Inspection | 1/18/2006 | 1/19/2006 | 1/19/2006 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Supply line flush | 3/8/2005 | 3/9/2005 | 3/9/2005 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed 3/9/2005 4:04:56 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/28/2004 | 10/28/2004 | 10/28/2004 | P | PART |
Troy Cobbley
|
|
|
Ok to finish cover of the fdc. Still need to remove the valve and install the ball drip. 10/28/2004 2:27:36 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/20/2004 | 10/21/2004 | 10/21/2004 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line hydro is passed. Other items as listed on the previous inspection still need to be addressed. 10/21/2004 1:28:15 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/20/2004 | 10/20/2004 | 10/20/2004 | A | FAIL |
Rick Jackson
|
|
|
To verify FDC and vault installation. Re submitted plans are in job trailer.; Phone #: ###-#### Internet Inspection Request from: Trent Bice Need gravel in pit; ball valve will have to be removed after hydro 10/20/2004 11:31:07 AM
|
Issue permit | | | 10/15/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/13/2004 | | 10/13/2004 | | PASS |
Bill Alexander
|
|
|
Revised scope of work to include remote FDC resubmittal.
|
Plan resubmittals received | | | 10/13/2004 | | |
|
|
|
|
Plan assigned to (Bill) | 10/13/2004 | | 10/13/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/13/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/13/2004 | | 10/13/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/13/2004 | | DONE |
|
|
|
called and talked gentlemen (don was ill) that his permit and fee is ready to be picked up cmc
|
Sprinkler Plan Check | 10/12/2004 | | 10/12/2004 | | FAIL |
Bill Alexander
|
|
|
Plan lacks detail concerning the added FDC appurtenance, piping, elevation, etc. per requirements of IFC 105.4 to verify minimum installation code.
|
INSP-Sprinkler Rough-in/Hydro | 10/11/2004 | 10/11/2004 | 10/11/2004 | P | FAIL |
Troy Cobbley
|
|
|
Need approval from bill or dave on modifications to the fire dept. connection location before covering of the pipe 10/11/2004 4:23:33 PM
|
Plan resubmittals received | | | 10/11/2004 | | DONE |
Bill Alexander
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 10/7/2004 | 10/8/2004 | 10/8/2004 | A | PART |
Troy Cobbley
|
|
|
Piping under roadway is ok to cover. Thrust blocks and beding is not done yet. Will verify this afternoon. 10/8/2004 12:27:16 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/7/2004 | 10/8/2004 | 10/8/2004 | P | CANC |
Troy Cobbley
|
|
|
Contractor to call in new inspection when the rest of the underground has been installed. Trent to provide pictures of the thrust block on the 45. 10/8/2004 3:19:36 PM
|
Issue and Print Permit | | | 10/7/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/7/2004 | | 10/7/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 10/5/2004 | | 10/6/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/5/2004 | | 10/6/2004 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/6/2004 | | 10/6/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/6/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/6/2004 | | DONE |
|
|
|
called and talked to receptionist that his permit and fee is ready to be picked up
|
Telephone call | | | 10/5/2004 | | DONE |
|
|
|
Contacted Don Weland. Need building permit or exact address.
|
Application received | | | 10/5/2004 | | |
|
|
|
|