INSP-Final Inspection | 1/21/2005 | 1/21/2005 | 1/21/2005 | P | PASS |
Troy Cobbley
|
|
|
fire sprinklers finaled
|
DOC - Permit Finaled | 1/21/2005 | 1/21/2005 | 1/21/2005 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 1/21/2005 4:11:44 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/17/2005 | 1/18/2005 | 1/18/2005 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed 1/18/2005 3:38:36 PM
|
INSP-Final Inspection | 1/17/2005 | 1/18/2005 | 1/18/2005 | P | FAIL |
Troy Cobbley
|
|
|
Need interconnections with the fire alarm system tested and the 200 degree upright in the riser room replaced with at 155 1/18/2005 3:57:38 PM
|
Issue and Print Permit | | | 1/7/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/5/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/5/2005 | | 1/5/2005 | | DONE |
|
|
|
|
Telephone call | | | 1/5/2005 | | DONE |
|
|
|
Left message for Randy that permit is ready & fees///1/5/05 8;10am BAS
|
Sprinkler Plan Check | 12/30/2004 | | 1/4/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/4/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/30/2004 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 12/17/2004 | 12/20/2004 | 12/20/2004 | P | PART |
Troy Cobbley
|
|
|
Upright sprinkler head is overspaced under the east stairway. Provide the correct size of hanger rings on the trapeze and resubmit plans showing the steel pipe instead of the plastic and the branchline that was added 12/20/2004 12:04:59 PM
|
INSP-Supply line flush | 12/15/2004 | 12/15/2004 | 12/15/2004 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line hydro test passed 12/15/2004 3:01:11 PM
|
INSP-Sprinkler Rough-in/Hydro | 12/15/2004 | 12/15/2004 | 12/15/2004 | P | PART |
Troy Cobbley
|
|
|
Restrooms and riser room is ok to cover 12/15/2004 3:01:40 PM
|
Issue and Print Permit | | | 10/27/2004 | | |
|
|
|
|
Telephone call | | | 10/26/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Permit Ready to Issue | | | 10/26/2004 | | |
|
|
|
|
Inspection Record Card- Fire | 10/26/2004 | | 10/26/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 10/11/2004 | | 10/22/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/11/2004 | | 10/22/2004 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2004 | | DONE |
|
|
|
|
Application received | | | 10/11/2004 | | |
|
|
|
|
Plan assigned to (Bill) | 12/30/2004 | | | | |
Bill Alexander
|
|
|
|