INSP-Sprinkler Rough-in/Hydro | 1/7/2005 | 1/7/2005 | 1/7/2005 | A | PASS |
Troy Cobbley
|
|
|
Mezzanine demo'ed 1/7/2005 1:17:36 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/7/2005 | 1/7/2005 | 1/7/2005 | A | PASS |
Troy Cobbley
|
|
|
Mezzanine demo'ed 1/7/2005 1:17:36 PM
|
DOC - Permit Finaled | 1/7/2005 | 1/7/2005 | 1/7/2005 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 1/7/2005 1:17:40 PM
|
DOC - Permit Finaled | 1/7/2005 | 1/7/2005 | 1/7/2005 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 1/7/2005 1:17:40 PM
|
Issue and Print Permit | | | 10/27/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/15/2004 | | 10/26/2004 | | PASS |
Bill Alexander
|
|
|
Demolition permit only
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/26/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 10/15/2004 | | 10/26/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/26/2004 | | 10/26/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/26/2004 | | DONE |
|
|
|
Spoke with Tom and told him that permit is ready & fees///10/26/04 4:20pm BAS
|
Miscellaneous action | | | 10/20/2004 | | DONE |
|
|
|
Permit review on hold till the BLD permit is approved.
|
Application received | | | 10/15/2004 | | |
|
|
|
|
Inspection Record Card- Fire | 10/26/2004 | | | | |
|
|
|
|