INSP-Final Inspection | 4/18/2006 | 4/18/2006 | 4/18/2006 | P | PASS |
Forrest France
|
|
|
Corrections have been completed, inspection passed.
|
INSP-Final Inspection | 5/18/2005 | 5/20/2005 | 5/20/2005 | P | PART |
Forrest France
|
|
|
Farmers and Merchants Bank spaces on the basement, first, and second floors passed fire alarm inspection. Revised plans need to reflect additional HS in basement elevator lobby, actual location of heat pump now in men's room, correct cd rating on HS in f
|
INSP-Final Inspection | 2/28/2005 | 3/1/2005 | 3/1/2005 | A | PART |
Troy Cobbley
|
|
|
Temporary occupancy given. Fire alarm panel and NAC panels inspected. Duct detectors on the sixth floor inspected. Induct detectors at main supply and returns on first through sixth floor inspected. Pull stations on all floors inspected. Audio visuals on sixth floor and first floor lobby inspected. Individual a/v's on first through sixth and basement inspected. All sprinkler monitoring points inspected. All other items not inspected. Plans will need to be resubmitted with changes which include ceiling mounted a/v's, deletion of pull on sixth floor, additional heat in penthouse and relocated NAC panels. 3/1/2005 2:53:28 PM
|
INSP-Final Inspection | 2/28/2005 | 2/28/2005 | 2/28/2005 | P | FAIL |
Troy Cobbley
|
|
|
Items tested included annunciation, manual pull stations and induct smoke detectors for common supply/returns for 2nd - 6th floors. Also tested duct smoke detectors on hvac units on 6th floor only. Tested all tamper switches and flow switches for basement through penthouse. Items still needing testing for temporary occupancy are elevator recall for the new elevators, induct detectors on first floor and duct detectors in penthouse and NAC supervision 2/28/2005 4:05:49 PM
|
INSP-Final Inspection | 2/23/2005 | 2/25/2005 | 2/25/2005 | A | FAIL |
Troy Cobbley
|
|
|
terri ###-#### Fire alarm is not ready for inspection. Fire pump controler handle has been broken. Fire pump is in phase reversal (running backwards). Elevator car 2 was not ready for recall testing. No sprinkler heads on second floor. Items tested are phones, battery loss, ac loss, pull stations in basement and first floor, loss of power at pump, pump running and phase reversal. System is not ready for testing. 2/25/2005 2:08:40 PM
|
INSP-Final Inspection | 2/23/2005 | 2/24/2005 | 2/24/2005 | A | CANC |
Troy Cobbley
|
|
|
terri ###-####
|
INSP-Alarm Testing | 2/18/2005 | 2/24/2005 | 2/24/2005 | A | CANC |
Troy Cobbley
|
|
|
terry ###-####
|
INSP-Conference | 2/17/2005 | 2/18/2005 | 2/18/2005 | A | DONE |
|
|
|
Tomlinson is requesting for inspection for the 6th floor occupancy on Thursday 2/24/05. The core and shell permits will NOT be ready to be finaled.
The entire building shall be WET. Spacing and head height in non-occupied and construction areas may be obstructed, hi/low heads are acceptable.
The following shall be completed and tested to allow a partial on the fire alarm inspection:
1) ALL sprinkler monitoring (throughout the building) and fire pump functional
2) Basement: pull stations at all exits. Clear access from the first floor to the riser room and fire pump.
3) 1st floor: all shell and core areas completed.
4) 2nd through 5th: pull stations at all exits. (restrooms need not have notification at this time)
5) The 6th floor complete.
|
Case Summary | | | 2/18/2005 | | DONE |
|
|
|
|
Miscellaneous action | | | 2/18/2005 | | DONE |
|
|
|
Faxed a copy of the activities that relate to the fire systems to Jim Tomlinson.
|
Alarm Plan Check | | | 2/17/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/17/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/17/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/17/2005 | | 2/17/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/17/2005 | | DONE |
|
|
|
Spoke with Rob and told him that permit is ready & fees////2/17/05 8:30am BAS
|
Issue and Print Permit | | | 2/17/2005 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 10/19/2004 | | 2/17/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/4/2005 | | |
|
|
|
|
Alarm Plan Check | | | 2/1/2005 | | FAIL |
|
|
|
Resubmittal required. Faxed comments to Rob Ahten. 2/1
|
Plan resubmittals received | | | 1/26/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/14/2005 | | DONE |
|
|
|
These plans will not be issued intil floor 1, 2, & 6 TI submittals recd core area are approved. Mary spoke with Rob Ahten (Protex) and he stated he would submit them on Tuesday 1/18/2005.
|
Issue and Print Permit | | | 12/9/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/10/2004 | | DONE |
|
|
|
Phone call to Kirk Morris (Cole and Associates). I called Kirk to explain the importance of making sure the fire alarm contractor (Rob Ahten, Protex) has the most updated drawings to assist him in getting the Core/Shell fa permits completed. Kirk stated that Rob received them yesterday. The shell/core will include all restrooms. I explained that I issued this permit as a partial to assist the construction personnel with the demo and prepare the new FACP for the shell/core areas. I also stated that the shell/core FA permits would be required to be "issued" prior to any FA review for a TI in the building. Kirk agreed to this.
|
Alarm Plan Check | | | 11/8/2004 | | PART |
|
|
|
No plans issued for this partial. See comments for addressing and field verification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/8/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/8/2004 | | 11/8/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/8/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Meeting | | | 11/4/2004 | | DONE |
|
|
|
Rob (protex) and the Tri-State Elec foreman and I met to discuss the submittal on the core of the building. It is a design build and the common, public areas have not been totally defined at this time. I have agreed to issue a Partial with a list only (no plans) to allow them to proceed. Rob will notify me of the date the remainder of the core design will be resubmitted.
I stated that I will not review any TI submittals until the entire core package has been issued.
|
Telephone call | | | 11/3/2004 | | DONE |
|
|
|
Called and left a message for ROb to contact me.
|
Telephone call | | | 11/1/2004 | | DONE |
|
|
|
Called Rob to get clarification.
|
Plan resubmittals received | | | 10/28/2004 | | DONE |
|
|
|
|
Alarm Plan Check | | | 10/28/2004 | | FAIL |
|
|
|
Plans show partial core initiating devices only, spoke with Rob (Protex) stated he had the new drawings ready will submit today.
|
Application received | | | 10/19/2004 | | |
|
|
|
|