INSP-Final Inspection | 4/18/2006 | 4/18/2006 | 4/18/2006 | P | PASS |
Forrest France
|
|
|
Corrections have been completed, inspection passed, permit finaled.
|
INSP-Final Inspection | 4/20/2005 | 4/22/2005 | 4/22/2005 | A | PART |
Forrest France
|
|
|
Fire alarm 2nd floor pass inspection.
|
INSP-Final Inspection | 2/28/2005 | 3/1/2005 | 3/1/2005 | A | PART |
Troy Cobbley
|
|
|
Temporary occupancy given. Fire alarm panel and NAC panels inspected. Duct detectors on the sixth floor inspected. Induct detectors at main supply and returns on first through sixth floor inspected. Pull stations on all floors inspected. Audio visuals on sixth floor and first floor lobby inspected. Individual a/v's on first through sixth and basement inspected. All sprinkler monitoring points inspected. All other items not inspected. Plans will need to be resubmitted with changes which include ceiling mounted a/v's, deletion of pull on sixth floor, additional heat in penthouse and relocated NAC panels. 3/1/2005 2:53:34 PM
|
INSP-Final Inspection | 2/28/2005 | 2/28/2005 | 2/28/2005 | P | FAIL |
Troy Cobbley
|
|
|
Items tested included annunciation, manual pull stations and induct smoke detectors for common supply/returns for 2nd - 6th floors. Also tested duct smoke detectors on hvac units on 6th floor only. Tested all tamper switches and flow switches for basement through penthouse. Items still needing testing for temporary occupancy are elevator recall for the new elevators, induct detectors on first floor and duct detectors in penthouse and NAC supervision 2/28/2005 4:06:01 PM
|
INSP-Alarm Testing | 2/18/2005 | 2/25/2005 | 2/25/2005 | A | FAIL |
Troy Cobbley
|
|
|
terry ###-#### Fire alarm is not ready for inspection. Fire pump controler handle has been broken. Fire pump is in phase reversal (running backwards). Elevator car 2 was not ready for recall testing. No sprinkler heads on second floor. Items tested are phones, battery loss, ac loss, pull stations in basement and first floor, loss of power at pump, pump running and phase reversal. System is just not ready to be tested. 2/25/2005 2:06:59 PM 2/25/2005 2:08:24 PM
|
Alarm Plan Check | | | 2/17/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/17/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/17/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/17/2005 | | 2/17/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/17/2005 | | DONE |
|
|
|
Spoke with Rob and told him that permit is ready & fees////2/17/05 8:30am BAS
|
Issue and Print Permit | | | 2/17/2005 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 10/19/2004 | | 2/17/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/16/2005 | | DONE |
|
|
|
Request to Rob (Protex) to send a revised matrix to include the elevator control voltage monitoring (item #7), and a manual pull station (item #4) at the exterior exit on the 7th floor. He stated he will fax them over.
|
Plan resubmittals received | | | 2/4/2005 | | |
|
|
|
|
Alarm Plan Check | | | 2/1/2005 | | FAIL |
|
|
|
Resubmittal required. Faxed comments to Rob Ahten 2/1
|
Plan resubmittals received | | | 1/26/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/14/2005 | | |
|
|
|
These plans will not be issued intil floor 1, 2, & 6 TI submittals recd core area are approved
|
Issue and Print Permit | | | 12/9/2004 | | DONE |
|
|
|
|
Alarm Plan Check | | | 11/8/2004 | | PART |
|
|
|
No plans issued for this partial. See comments for addressing and field verification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/8/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/8/2004 | | 11/8/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/8/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Meeting | | | 11/4/2004 | | DONE |
|
|
|
Rob (protex) and the Tri-State Elec foreman and I met to discuss the submittal on the core of the building. It is a design build and the common, public areas have not been totally defined at this time. I have agreed to issue a Partial with a list only (no plans) to allow them to proceed. Rob will notify me of the date the remainder of the core design will be resubmitted.
I stated that I will not review any TI submittals until the entire core package has been issued.
|
Telephone call | | | 11/3/2004 | | DONE |
|
|
|
Called and left a message for ROb to contact me.
|
Telephone call | | | 11/1/2004 | | DONE |
|
|
|
Called Rob to get clarification.
|
Plan resubmittals received | | | 10/28/2004 | | DONE |
|
|
|
|
Alarm Plan Check | | | 10/28/2004 | | FAIL |
|
|
|
Plans show partial core initiating devices only, spoke with Rob (Protex) stated he had the new drawings ready will submit today.
|
Application received | | | 10/19/2004 | | |
|
|
|
|