INSP-Final Inspection | 11/3/2005 | 11/4/2005 | 11/3/2005 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 4/8/2005 | 4/8/2005 | 4/8/2005 | P | FAIL |
Forrest France
|
|
|
Need test papers and fix ball drip
|
Permit Ready to Issue | | | 4/7/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/7/2005 | | DONE |
|
|
|
tlk to receptionist ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 4/7/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/7/2005 | | 4/7/2005 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 4/5/2005 | 4/6/2005 | 4/6/2005 | A | PASS |
Forrest France
|
|
|
24 hour air test and the hydro test of the header and fdc passed. Still need test papers
|
INSP-Sprinkler Rough-in/Hydro | 4/5/2005 | 4/5/2005 | 4/6/2005 | P | PART |
Forrest France
|
|
|
24 hour pressure test on dry sytem started at 11:00 with 43.5 psi
|
Sprinkler Plan Check | 3/30/2005 | | 4/6/2005 | | PASS |
Bill Alexander
|
|
|
Field Changes/Modifications
|
Plan assigned to (Bill) | 3/30/2005 | | 4/6/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/30/2005 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 3/9/2005 | 3/10/2005 | 3/10/2005 | P | PASS |
Troy Cobbley
|
|
|
Hydro test for the wet system, dry system and the underground supply passed. Still need to hydro the header and the fdc. Also need the 24 hour air test on the dry system done. 3/10/2005 3:40:47 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/3/2005 | 3/9/2005 | 3/9/2005 | P | CANC |
Troy Cobbley
|
|
|
Contact: Brian -- AG and UG 200 lb hydro test. Would like around 11:30; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
INSP-Sprinkler Rough-in/Hydro | 3/9/2005 | 3/9/2005 | 3/9/2005 | P | CANC |
Troy Cobbley
|
|
|
not ready until tomorrow 3/9/2005 12:56:19 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/2/2005 | 3/3/2005 | 3/3/2005 | A | PART |
Troy Cobbley
|
|
|
First floor center section of the building is ok to cover. Insulation is not being added. 3/3/2005 1:49:30 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/24/2005 | 2/24/2005 | 2/24/2005 | P | PART |
Troy Cobbley
|
|
|
Rough-in center section passed. Needs re-inspection after insulation is installed to check for obstructions. A upright or insulation needs to be added at the south stairs in a combustible pocket. 2/24/2005 3:36:22 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/23/2005 | 2/23/2005 | 2/23/2005 | P | PART |
Troy Cobbley
|
|
|
Second floor tenting is ok. Second floor piping is ok to cover. Rough-in on first floor center failed. Some upright heads need relocated. Brian will make adjustments. 2/23/2005 4:35:48 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | FAIL |
Troy Cobbley
|
|
|
Tenting for the second floor needs minor fixing before getting an approval 2/22/2005 3:55:38 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/16/2005 | 2/16/2005 | 2/16/2005 | P | PART |
Troy Cobbley
|
|
|
Sprinkler piping rough-in for the second floor is ok. Still need tenting inspection 2/16/2005 4:22:53 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/10/2005 | 2/10/2005 | 2/10/2005 | P | PART |
Troy Cobbley
|
|
|
west wing ok to cover 2/11/2005 7:56:21 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/9/2005 | 2/9/2005 | 2/9/2005 | P | FAIL |
Troy Cobbley
|
|
|
There are still acouple of areas that need better tenting. Brian will fix and call in inspection 2/9/2005 4:06:30 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/7/2005 | 2/8/2005 | 2/8/2005 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for tenting in the west wing. Tenting not adequately attached to structure. Needs reinspection 2/8/2005 10:30:13 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/7/2005 | 2/8/2005 | 2/8/2005 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for tenting in the west wing. Tenting not adequately attached to structure. Needs reinspection 2/8/2005 10:30:13 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/8/2005 | 2/8/2005 | 2/8/2005 | P | CANC |
Troy Cobbley
|
|
|
A stop work order has been issued by the electrical inspector for all work at the job site. No inspection performed for the west wing tenting. 2/8/2005 3:36:26 PM
|
INSP-Sprinkler Rough-in | 1/24/2005 | 1/25/2005 | 1/25/2005 | P | PART |
Troy Cobbley
|
|
|
The sprinkler piping in the east wing is ok to cover. Brian with Debest will verify that the electrician does not disturb the tenting prior to cover. Sprinkler piping rough-in in the west wing is ok. Needs tenting inspection before cover. 1/25/2005 3:33:55 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/19/2005 | 1/20/2005 | 1/20/2005 | A | FAIL |
Troy Cobbley
|
|
|
Insulation is not correct and the branchline running the length of the north corridor does not appear to have any straps on the piping. Provide verification from the structural engineer that it is ok to support the sprinkler piping on the top of the bottom chords of the trusses. This inspection was for the east wing. 1/20/2005 12:02:18 PM
|
Sprinkler Plan Check | 11/22/2004 | | 11/22/2004 | | PASS |
Bill Alexander
|
|
|
|
Miscellaneous action | | | 11/22/2004 | | DONE |
|
|
|
2nd Review (approved) taken to the permit desk for calling and returning.
|
Inspection Record Card- Fire | 11/22/2004 | | 11/22/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/22/2004 | | DONE |
|
|
|
Spoke with Alisha and told her that permit is ready & no fees due///11/22/04 11:17am BAS
|
Plan resubmittals received | | | 11/12/2004 | | |
|
|
|
|
Inspection Record Card- Fire | 11/8/2004 | | 11/8/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/8/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/8/2004 | | DONE |
|
|
|
Lef message with Alishia that permit is ready & fees///11/08/04 8:02am BAS
|
Issue and Print Permit | | | 11/8/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 10/20/2004 | | 11/5/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/20/2004 | | 11/5/2004 | | PART |
Bill Alexander
|
|
|
Reference review notes attached
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2004 | | DONE |
|
|
|
|
Application received | | | 10/20/2004 | | |
|
|
|
|