Permit Information
Permit NumberFIR04-00666
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 1065 S ALLANTE PL
Project NameSPR KELLER WILLIAMS REALTY
Customer Number 
ePlanReview 
Description
KELLER WILLIAMS REALTY - To install one wet and one dry pipe system in a new 16,890-ft/2, two story, wood framed, office building. The sprinklers are used for area increase and story increase. First Floor: 12,810-ft/2. Second Floor: 4080-ft/2. The fire sprinkler system work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. Underground fire service supply was permitted under FIR04-00536. This permit is attached to building permit: BLD04-01048.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/3/200511/4/200511/3/2005APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection4/8/20054/8/20054/8/2005PFAIL
DetailsForrest France
Need test papers and fix ball drip
Permit Ready to Issue  4/7/2005 DONE
Telephone call  4/7/2005 DONE
tlk to receptionist ###-#### that permit and fees are ready to be picked up
Issue and Print Permit  4/7/2005 DONE
Inspection Record Card- Fire4/7/2005 4/7/2005 DONE
INSP-Sprinkler Rough-in/Hydro4/5/20054/6/20054/6/2005APASS
DetailsForrest France
24 hour air test and the hydro test of the header and fdc passed. Still need test papers
INSP-Sprinkler Rough-in/Hydro4/5/20054/5/20054/6/2005PPART
DetailsForrest France
24 hour pressure test on dry sytem started at 11:00 with 43.5 psi
Sprinkler Plan Check3/30/2005 4/6/2005 PASS
DetailsBill Alexander
Field Changes/Modifications
Plan assigned to (Bill)3/30/2005 4/6/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/6/2005 DONE
Plan resubmittals received  3/30/2005  
INSP-Sprinkler Rough-in/Hydro3/9/20053/10/20053/10/2005PPASS
DetailsTroy Cobbley
Hydro test for the wet system, dry system and the underground supply passed. Still need to hydro the header and the fdc. Also need the 24 hour air test on the dry system done. 3/10/2005 3:40:47 PM
INSP-Sprinkler Rough-in/Hydro3/3/20053/9/20053/9/2005PCANC
DetailsTroy Cobbley
Contact: Brian -- AG and UG 200 lb hydro test. Would like around 11:30; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Sprinkler Rough-in/Hydro3/9/20053/9/20053/9/2005PCANC
DetailsTroy Cobbley
not ready until tomorrow 3/9/2005 12:56:19 PM
INSP-Sprinkler Rough-in/Hydro3/2/20053/3/20053/3/2005APART
DetailsTroy Cobbley
First floor center section of the building is ok to cover. Insulation is not being added. 3/3/2005 1:49:30 PM
INSP-Sprinkler Rough-in/Hydro2/24/20052/24/20052/24/2005PPART
DetailsTroy Cobbley
Rough-in center section passed. Needs re-inspection after insulation is installed to check for obstructions. A upright or insulation needs to be added at the south stairs in a combustible pocket. 2/24/2005 3:36:22 PM
INSP-Sprinkler Rough-in/Hydro2/23/20052/23/20052/23/2005PPART
DetailsTroy Cobbley
Second floor tenting is ok. Second floor piping is ok to cover. Rough-in on first floor center failed. Some upright heads need relocated. Brian will make adjustments. 2/23/2005 4:35:48 PM
INSP-Sprinkler Rough-in/Hydro2/22/20052/22/20052/22/2005PFAIL
DetailsTroy Cobbley
Tenting for the second floor needs minor fixing before getting an approval 2/22/2005 3:55:38 PM
INSP-Sprinkler Rough-in/Hydro2/16/20052/16/20052/16/2005PPART
DetailsTroy Cobbley
Sprinkler piping rough-in for the second floor is ok. Still need tenting inspection 2/16/2005 4:22:53 PM
INSP-Sprinkler Rough-in/Hydro2/10/20052/10/20052/10/2005PPART
DetailsTroy Cobbley
west wing ok to cover 2/11/2005 7:56:21 AM
INSP-Sprinkler Rough-in/Hydro2/9/20052/9/20052/9/2005PFAIL
DetailsTroy Cobbley
There are still acouple of areas that need better tenting. Brian will fix and call in inspection 2/9/2005 4:06:30 PM
INSP-Sprinkler Rough-in/Hydro2/7/20052/8/20052/8/2005AFAIL
DetailsTroy Cobbley
Inspection was for tenting in the west wing. Tenting not adequately attached to structure. Needs reinspection 2/8/2005 10:30:13 AM
INSP-Sprinkler Rough-in/Hydro2/7/20052/8/20052/8/2005AFAIL
DetailsTroy Cobbley
Inspection was for tenting in the west wing. Tenting not adequately attached to structure. Needs reinspection 2/8/2005 10:30:13 AM
INSP-Sprinkler Rough-in/Hydro2/8/20052/8/20052/8/2005PCANC
DetailsTroy Cobbley
A stop work order has been issued by the electrical inspector for all work at the job site. No inspection performed for the west wing tenting. 2/8/2005 3:36:26 PM
INSP-Sprinkler Rough-in1/24/20051/25/20051/25/2005PPART
DetailsTroy Cobbley
The sprinkler piping in the east wing is ok to cover. Brian with Debest will verify that the electrician does not disturb the tenting prior to cover. Sprinkler piping rough-in in the west wing is ok. Needs tenting inspection before cover. 1/25/2005 3:33:55 PM
INSP-Sprinkler Rough-in/Hydro1/19/20051/20/20051/20/2005AFAIL
DetailsTroy Cobbley
Insulation is not correct and the branchline running the length of the north corridor does not appear to have any straps on the piping. Provide verification from the structural engineer that it is ok to support the sprinkler piping on the top of the bottom chords of the trusses. This inspection was for the east wing. 1/20/2005 12:02:18 PM
Sprinkler Plan Check11/22/2004 11/22/2004 PASS
DetailsBill Alexander
Miscellaneous action  11/22/2004 DONE
2nd Review (approved) taken to the permit desk for calling and returning.
Inspection Record Card- Fire11/22/2004 11/22/2004 DONE
Telephone call  11/22/2004 DONE
Spoke with Alisha and told her that permit is ready & no fees due///11/22/04 11:17am BAS
Plan resubmittals received  11/12/2004  
Inspection Record Card- Fire11/8/2004 11/8/2004 DONE
Permit Ready to Issue  11/8/2004 DONE
Telephone call  11/8/2004 DONE
Lef message with Alishia that permit is ready & fees///11/08/04 8:02am BAS
Issue and Print Permit  11/8/2004 DONE
Plan assigned to (Bill)10/20/2004 11/5/2004 DONE
Sprinkler Plan Check10/20/2004 11/5/2004 PART
DetailsBill Alexander
Reference review notes attached
PLANS/APPL TAKEN TO FRONT DESK  11/5/2004 DONE
Application received  10/20/2004