INSP-Final Inspection | 1/18/2006 | 1/18/2006 | 1/19/2006 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 1/10/2006 | 1/11/2006 | 1/11/2006 | P | PASS |
Troy Cobbley
|
|
|
Dry system trip test and forward flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 1/10/2006 | 1/10/2006 | 1/10/2006 | A | PART |
Troy Cobbley
|
|
|
Above ground hydro tests passed. Sprinkler devices on wet sytem passed alarm inspection.
|
INSP-Sprinkler Rough-in/Hydro | 1/6/2006 | 1/9/2006 | 1/9/2006 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 1/6/2006 at 2:06:03 PM. Contact: ###-####.
|
INSP-Sprinkler Rough-in | 12/30/2005 | 1/3/2006 | 1/3/2006 | A | FAIL |
Troy Cobbley
|
|
|
The sprinkler pendant just inside of the laundery room door is still overspaced. Piping (cpvc) in the mechanical room under the north stairs is exposed and needs to meet installation guide.
|
INSP-Sprinkler Rough-in | 12/22/2005 | 12/22/2005 | 12/23/2005 | A | FAIL |
Troy Cobbley
|
|
|
Sprinkler pendants in basement laundry room are overspaced. A separation is needed in the attic area between the washing machines and the open laundry area.
|
INSP-Sprinkler Rough-in | 12/21/2005 | 12/21/2005 | 12/22/2005 | P | DEFR |
Forrest France
|
|
|
Inspection to be completed 12/ 22 per agreement with contractor.
|
INSP-Sprinkler Rough-in/Hydro | 11/28/2005 | 11/28/2005 | 11/28/2005 | A | PART |
Forrest France
|
|
|
Overhead rough-in at the basement confrence room is good for cover, one head at the NW corner is within 1' of a heat diffuser and a can light (may need an intermediate temp. head at this location).
|
INSP-Sprinkler Rough-in/Hydro | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | CANC |
Troy Cobbley
|
|
|
No time for inspection
|
INSP-Sprinkler Rough-in/Hydro | 11/21/2005 | 11/22/2005 | 11/22/2005 | A | CANC |
Troy Cobbley
|
|
|
No time for inspection
|
INSP-Sprinkler Rough-in/Hydro | 9/12/2005 | 9/12/2005 | 9/12/2005 | A | PART |
Troy Cobbley
|
|
|
Main lobby is ok to cover. Basement east side of main corridor is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 8/24/2005 | 8/24/2005 | 8/24/2005 | P | PART |
Forrest France
|
|
|
Overhead rough-in for the basement area from column lines 3 through 14 on the west side of the corridor as marked on sheet FP2 of the approved plans is acceptable to cover.
|
INSP-Sprinkler Rough-in/Hydro | 7/29/2005 | 7/29/2005 | 7/29/2005 | P | PASS |
Troy Cobbley
|
|
|
Swimming pool area piping ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | PASS |
Troy Cobbley
|
|
|
Canopy is ok to cover. Eq bracing and upright have been added
|
INSP-Sprinkler Rough-in/Hydro | 7/11/2005 | 7/11/2005 | 7/11/2005 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was for the drive through canopy. Need eq bracing for the sprig ups and one additional upright at the east overbuild. Also the third and second floor corridors are ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 6/16/2005 | 6/17/2005 | 6/17/2005 | P | PART |
Forrest France
|
|
|
Overhead rough-in basement area CPVC mains and branch lines are OK to cover.
|
INSP-Supply line flush | 6/16/2005 | 6/17/2005 | 6/17/2005 | P | PART |
Forrest France
|
|
|
Underground fire supply line flush satisfactory.
|
CHANGE STATUS TO (ISS) | | | 6/16/2005 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 6/14/2005 | 6/14/2005 | 6/14/2005 | P | PART |
Troy Cobbley
|
|
|
Ok to cover the conference room and corridor in the basement.
|
INSP-Sprinkler Rough-in/Hydro | 6/13/2005 | 6/13/2005 | 6/13/2005 | P | FAIL |
Troy Cobbley
|
|
|
Plans do not match installation
|
INSP-Supply line flush | 6/13/2005 | 6/13/2005 | 6/13/2005 | P | FAIL |
Troy Cobbley
|
|
|
No water to perform flush. Bill Thompson with United Water was contacted and the fire hydrants were put in service. Fire sprinkler contract needs to get service order so fire supply can become active.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2005 | | DONE |
|
|
|
|
Telephone call | | | 6/13/2005 | | DONE |
|
|
|
tlk to secretary ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 6/13/2005 | | |
|
|
|
|
(F) Reprint permit | | | 6/13/2005 | | |
|
|
|
|
Plan assigned to (Bill) | 6/3/2005 | | 6/13/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/3/2005 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 5/24/2005 | 5/24/2005 | 5/24/2005 | P | PASS |
Troy Cobbley
|
|
|
First floor hydro test passed. Guest room sprinkler piping is ok to cover
|
Issue permit | | | 5/18/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/6/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/6/2005 | | DONE |
|
|
|
|
Telephone call | | | 5/6/2005 | | DONE |
|
|
|
tlk to tom ###-#### that permit and fees are ready to be picked up
|
Sprinkler Plan Check | 4/28/2005 | | 5/6/2005 | | PASS |
Bill Alexander
|
|
|
Per Plan Modifications.
|
INSP-Sprinkler Rough-in/Hydro | 5/2/2005 | 5/3/2005 | 5/3/2005 | A | PART |
Troy Cobbley
|
|
|
Looked at the fourth floor corridor piping. Notified Tom that resubmitals will be required.
|
Plan resubmittals received | | | 4/28/2005 | | |
|
|
|
|
INSP-Sprinkler Rough-in | 4/21/2005 | 4/22/2005 | 4/22/2005 | A | PART |
Troy Cobbley
|
|
|
Second floor sprinkler piping is ok to cover except corridor, pool area and central lobby area
|
INSP-Sprinkler Rough-in/Hydro | 4/20/2005 | 4/21/2005 | 4/21/2005 | P | PASS |
Forrest France
|
|
|
Second floor, guest rooms only, hydro. test satisfactory.
|
INSP-Sprinkler Rough-in | 4/20/2005 | 4/20/2005 | 4/20/2005 | P | PASS |
Troy Cobbley
|
|
|
tom ###-#### Sprinkler piping at the north and south ends of the third floor is ok to cover.
|
Issue and Print Permit | | | 4/20/2005 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 4/18/2005 | 4/19/2005 | 4/19/2005 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for tenting on the third floor. Tenting failed. Need to re-inspect
|
Sprinkler Plan Check | 4/7/2005 | | 4/18/2005 | | PASS |
Bill Alexander
|
|
|
Per Review Comments
|
Plan assigned to (Bill) | 4/6/2005 | | 4/18/2005 | | DONE |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/18/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/18/2005 | | DONE |
|
|
|
spoke with tom told him permit is ready and fees 4/18/05 3:50 BAS
|
Inspection Record Card- Fire | 4/18/2005 | | 4/18/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/7/2005 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 3/26/2005 | 3/28/2005 | 3/28/2005 | A | PART |
Troy Cobbley
|
|
|
Hydro test for the standpipe and the third floor failed. Rough-in for the fourth floor sidewalls in rooms passed. 3/28/2005 12:03:46 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/16/2005 | 3/16/2005 | 3/16/2005 | A | PASS |
Troy Cobbley
|
|
|
Attic system roughin is ok. This includes the eaves on the third floor. Changes have been made to the plans that will require resubmittals. This includes an extra layer of piping and heads in the tower, a main re route at the north end and the drive through 3/16/2005 1:22:51 PM
|
INSP-Supply line flush | 3/16/2005 | 3/16/2005 | 3/16/2005 | A | PASS |
Troy Cobbley
|
|
|
Undergrouund supply flush was not done. Underground and attic system hydro test passed 3/16/2005 11:14:57 AM
|
INSP-Supply line flush | 3/3/2005 | 3/3/2005 | 3/3/2005 | A | PART |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover. Notified contractor that a tamper switch would be needed for the Post Indicator Valve. 3/3/2005 1:18:56 PM
|
FIR-Aging Inspection | 2/17/2005 | 2/17/2005 | 2/17/2005 | | NR |
Troy Cobbley
|
|
|
Per tom work is in progress 2/17/2005 4:39:08 PM
|
Telephone call | | | 1/19/2005 | | DONE |
|
|
|
tlk to secretary that thier permit is ready to picked up - no fees
|
Inspection Record Card- Fire | 1/19/2005 | | 1/19/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/13/2005 | | 1/18/2005 | | PASS |
Bill Alexander
|
|
|
|
Miscellaneous action | | | 1/18/2005 | | DONE |
|
|
|
Took plans to permit desk 12:05pm
|
Plan resubmittals received | | | 1/13/2005 | | |
|
|
|
|
Issue and Print Permit | | | 11/18/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/16/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/16/2004 | | 11/16/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/16/2004 | | DONE |
|
|
|
Left message with Tracy that permit is ready & fees///11/16/04 9:05am BAS
|
Plan assigned to (Bill) | 10/28/2004 | | 11/15/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/28/2004 | | 11/15/2004 | | PART |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2004 | | DONE |
|
|
|
|
Application received | | | 10/28/2004 | | |
|
|
|
|
Plan assigned to (Bill) | 4/28/2005 | | | | |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 6/3/2005 | | | | |
Bill Alexander
|
|
|
|