INSP-Final Inspection | 1/7/2005 | 1/10/2005 | 1/10/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinklers finaled 1/10/2005 3:16:05 PM
|
DOC - Permit Finaled | 1/10/2005 | 1/10/2005 | 1/10/2005 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 1/10/2005 3:17:10 PM
|
Telephone call | | | 12/15/2004 | | DONE |
|
|
|
lft vm larren bailey ###-#### that his permit is ready to be picked up and no fee!
|
Sprinkler Plan Check | 12/6/2004 | | 12/13/2004 | | PASS |
Bill Alexander
|
|
|
Added cooler and freezer protection
|
Miscellaneous action | | | 12/13/2004 | | DONE |
|
|
|
Took modified plan and documents to permit desk for distribution.
|
Plan resubmittals received | | | 12/6/2004 | | |
|
|
|
|
INSP-Final Inspection | 12/2/2004 | 12/2/2004 | 12/2/2004 | P | PART |
Troy Cobbley
|
|
|
Pendant heads as shown on the plans are ok to cover but two additional heads are required in the cooler and the freezer 12/2/2004 4:08:24 PM
|
Issue and Print Permit | | | 11/12/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/8/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/8/2004 | | 11/8/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/8/2004 | | DONE |
|
|
|
Spoke with Larren and told him that permit is ready & fees///11/08/04 8:00am BAS
|
Plan assigned to (Bill) | 11/4/2004 | | 11/5/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/4/2004 | | 11/5/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2004 | | DONE |
|
|
|
|
Application received | | | 11/4/2004 | | |
|
|
|
|