INSP-Final Inspection | 4/6/2005 | 4/6/2005 | 4/6/2005 | P | PASS |
Forrest France
|
|
|
fire sprinkler finaled
|
INSP-Supply line flush | 3/28/2005 | 3/29/2005 | 3/29/2005 | A | PASS |
Troy Cobbley
|
|
|
underground supply hydro passed 3/29/2005 10:57:00 AM
|
INSP-Sprinkler Rough-in | 3/15/2005 | 3/17/2005 | 3/17/2005 | P | PART |
Troy Cobbley
|
|
|
Underground flush is ok. Overhead rough-in is ok except that the sprig ups need to be centered inbetween the trusses as per the review comments. The line over the riser room needs to be inspected when installed. Need letter stating that it is ok to hang the sprinkler piping from the bottom chord of the trusses. 3/17/2005 4:12:55 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/18/2004 | 11/19/2004 | 11/19/2004 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line is ok to cover 11/19/2004 2:36:55 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/18/2004 | 11/18/2004 | 11/18/2004 | P | CANC |
Troy Cobbley
|
|
|
Contact: Chris - UG Cover Inspection - Would like around 4 PM this afternoon, please call to confirm; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
Issue and Print Permit | | | 11/9/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 11/5/2004 | | 11/8/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/8/2004 | | 11/8/2004 | | PASS |
Troy Cobbley
|
|
|
Approved underground supply only
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2004 | | DONE |
Troy Cobbley
|
|
|
Approved underground supply only
|
Inspection Record Card- Fire | 11/8/2004 | | 11/8/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/8/2004 | | DONE |
|
|
|
|
Application received | | | 11/5/2004 | | |
|
|
|
|