INSP-Alarm Testing | 2/24/2005 | 2/25/2005 | 2/25/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire alarm finaled 2/25/2005 11:34:25 AM
|
DOC - Permit Finaled | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 2/25/2005 11:34:29 AM
|
Issue and Print Permit | | | 2/14/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/9/2005 | | 2/9/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/9/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/9/2005 | | DONE |
|
|
|
called phil told him permit is ready to pick up
|
Telephone call | | | 2/9/2005 | | DONE |
|
|
|
Spoke with Yuri and told him that permit is ready & fees///2/9/05 12:00pm BAS
|
Alarm Plan Check | | | 2/8/2005 | | PASS |
|
|
|
Plan Modification. Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/28/2005 | | |
|
|
|
|
INSP-Alarm Testing | 12/14/2004 | 12/14/2004 | 12/14/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/14/2004 at 8:46:50 AM. Contact: ###-####. Will close out after resubmittals are received for the addition of SD due to beams; tested okay for preaction system 12/16/2004 9:47:52 AM
|
INSP-Alarm Testing | 12/13/2004 | 12/13/2004 | 12/13/2004 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/13/2004 at 8:37:24 AM. Contact: ###-####. Need detectors in beam pockets - beams are 18 inches deep; resubmittals required per Mary 12/13/2004 4:30:03 PM
|
INSP-Alarm Testing | 12/9/2004 | 12/10/2004 | 12/10/2004 | P | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/9/2004 at 7:46:27 AM. Contact: ###-####. Per contractor the inspection will have to be reschuled 12/10/2004 2:58:35 PM
|
Plan assigned to (Mary) | 11/12/2004 | | 12/1/2004 | | DONE |
|
|
|
|
Alarm Plan Check | | | 12/1/2004 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/1/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/1/2004 | | 12/1/2004 | | DONE |
|
|
|
|
Telephone call | | | 12/1/2004 | | DONE |
|
|
|
lft msg with laurie for Phil ###-#### - that their permit and fees are ready
|
Issue and Print Permit | | | 12/1/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/29/2004 | | DONE |
|
|
|
Received revised battery calculations and manufacturers cutsheets for a remote battery box and 12 a-h batteries. The battery size required will be determined with field measurements. If required the 12 a-h battery will be installed.
|
Telephone call | | | 11/26/2004 | | DONE |
|
|
|
Called Phil Omas, Sentry, the battery calculations do not include the AUX ckt supervisory current, the supervising module current and the SOV current seems a little low. He will talk with Jim Falk on Monday and get revised calcs to me. (The AUX current as supervisory takes the required battery size to 7.9 a-h. At this time 7 a-h batteries are installed.)
|
Plan resubmittals received | | | 11/17/2004 | | DONE |
|
|
|
|
Alarm Plan Check | | | 11/16/2004 | | FAIL |
|
|
|
Resubmittal required. Faxed comments to Phil Omas.
|
Application received | | | 11/12/2004 | | |
|
|
|
|