Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR04-00710
StatusFinaled
Name SENTRY SECURITY SYSTEMS
Site Address 970 W RIVER ST
Project NamealmIDAHO SELF STORAGE BLDG A/B
Customer Number 
ePlanReview 
Description
To provide monitoring on a special extinguishing system and release a double interlocked pre-action sprinkler system for the vault. The required sprinkler monitoring fire alarm system includes the monitoring of the special extinguishing system. The extinguishing system consists of two panels, one as a slave to the control panel.

2/8/2005 - Three additional smoke detectors were added to the vault area because of 18" beams located at the ceiling, therefore a smoke detector was placed in each "beam Pocket" per NFPA 72.

The associated building permit (BLD 04-01854) is to construct a new 710 sq. ft. fire rated storage vault for multi-media and paper documents in southwest corner of existing 33,060 sq. ft. warehouse building per approved plans on file. Fire rating the vault is per the owner's request and not required by code. Work to include new reinforced concrete footings and foundation, new concrete slab, new reinforced CMU walls, new steel ceiling beams, new steel deck and concrete slab ceiling, new 3-hour rated door assembly, fire sprinkler and alarm work, some new mechanical work, and some electrical work. Special Inspection is required for concrete, reinforcing steel, structural field welding, structural masonry, and epoxy/adhesive anchor installations. This is a Scope of Work Permit. A Letter of Completion is to be issued when done. NOTE: This building is fully fire sprinklered for area increase. (PC#0520-04) JCB (IDAHO RECORDS MANAGEMENT)(IDAHO SELF STORAGE - BLDG A/B-1ST FLR)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Alarm Testing2/24/20052/25/20052/25/2005APASS
DetailsTroy Cobbley
Fire alarm finaled 2/25/2005 11:34:25 AM
DOC - Permit Finaled2/25/20052/25/20052/25/2005PPASS
DetailsTroy Cobbley
Finaled by inspector at 2/25/2005 11:34:29 AM
Issue and Print Permit  2/14/2005 DONE
Inspection Record Card- Fire2/9/2005 2/9/2005 DONE
Permit Ready to Issue  2/9/2005 DONE
Telephone call  2/9/2005 DONE
called phil told him permit is ready to pick up
Telephone call  2/9/2005 DONE
Spoke with Yuri and told him that permit is ready & fees///2/9/05 12:00pm BAS
Alarm Plan Check  2/8/2005 PASS
Plan Modification. Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  2/8/2005 DONE
Plan resubmittals received  1/28/2005  
INSP-Alarm Testing12/14/200412/14/200412/14/2004PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/14/2004 at 8:46:50 AM. Contact: ###-####. Will close out after resubmittals are received for the addition of SD due to beams; tested okay for preaction system 12/16/2004 9:47:52 AM
INSP-Alarm Testing12/13/200412/13/200412/13/2004PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/13/2004 at 8:37:24 AM. Contact: ###-####. Need detectors in beam pockets - beams are 18 inches deep; resubmittals required per Mary 12/13/2004 4:30:03 PM
INSP-Alarm Testing12/9/200412/10/200412/10/2004PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/9/2004 at 7:46:27 AM. Contact: ###-####. Per contractor the inspection will have to be reschuled 12/10/2004 2:58:35 PM
Plan assigned to (Mary)11/12/2004 12/1/2004 DONE
Alarm Plan Check  12/1/2004 PASS
Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  12/1/2004 DONE
Inspection Record Card- Fire12/1/2004 12/1/2004 DONE
Telephone call  12/1/2004 DONE
lft msg with laurie for Phil ###-#### - that their permit and fees are ready
Issue and Print Permit  12/1/2004 DONE
Plan resubmittals received  11/29/2004 DONE
Received revised battery calculations and manufacturers cutsheets for a remote battery box and 12 a-h batteries. The battery size required will be determined with field measurements. If required the 12 a-h battery will be installed.
Telephone call  11/26/2004 DONE
Called Phil Omas, Sentry, the battery calculations do not include the AUX ckt supervisory current, the supervising module current and the SOV current seems a little low. He will talk with Jim Falk on Monday and get revised calcs to me. (The AUX current as supervisory takes the required battery size to 7.9 a-h. At this time 7 a-h batteries are installed.)
Plan resubmittals received  11/17/2004 DONE
Alarm Plan Check  11/16/2004 FAIL
Resubmittal required. Faxed comments to Phil Omas.
Application received  11/12/2004