INSP-Sprinkler Rough-in/Hydro | 2/10/2005 | 2/11/2005 | 2/11/2005 | A | PASS |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 2/10/2005 at 3:33:45 PM. Contact: ###-####.
|
DOC - Permit Finaled | 2/11/2005 | 2/11/2005 | 2/11/2005 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 2/11/2005 12:24:59 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/10/2005 | 2/10/2005 | 2/10/2005 | P | FAIL |
Troy Cobbley
|
|
|
Looked at tie in but could not inspect the rest of the work due to GE calibrating the MRI machine. 2/10/2005 1:33:50 PM
|
Issue and Print Permit | | | 1/14/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/11/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/11/2005 | | 1/11/2005 | | DONE |
|
|
|
|
Telephone call | | | 1/11/2005 | | DONE |
|
|
|
Spoke with Jeff and told him that permit is ready & fees///1/11/05 10:30am BAS
|
Sprinkler Plan Check | 1/4/2005 | | 1/10/2005 | | PASS |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 1/4/2005 | | 1/10/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/4/2005 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 12/23/2004 | 12/27/2004 | 12/27/2004 | A | PART |
Rick Jackson
|
|
|
eric; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Okay to cover MRI vault only; will verify required room separation at next phase 12/27/2004 11:17:29 AM
|
Permit Ready to Issue | | | 12/21/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/21/2004 | | 12/21/2004 | | DONE |
|
|
|
|
Telephone call | | | 12/21/2004 | | DONE |
|
|
|
Spoke with Greg and told him that permit is ready & fees///12/21/04 8:40am BAS
|
Issue and Print Permit | | | 12/21/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 12/2/2004 | | 12/20/2004 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 12/15/2004 | | 12/20/2004 | | PASS |
Bill Alexander
|
|
|
Construction must be verified.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/15/2004 | | DONE |
|
|
|
|
Telephone call | | | 12/13/2004 | | DONE |
|
|
|
called jeff t anderson ###-#### that his plan failed and needs to be returned to sender
|
Sprinkler Plan Check | 12/2/2004 | | 12/10/2004 | | FAIL |
Bill Alexander
|
|
|
8:45AM. Problem with calcs/separation connected fitting, etc. Called Jeff Anderson, (gone). Jeff Packham is responding.
1. Plans are incomplete. Provide a facility location map addressing the area of work this scope of work is being performed.
2. The designer is not incorporating 11.2.3.2 and does not address the design implementing in this system addition/area. Reference each allowed addressed in NFPA 13:11.2.3.2, 11.2.3.3 and 11.2.3.4. Whichever the designer is implementing, it must be identifiable, clear, addressed correctly and fully. All related and pertinent information must be included substantiating acceptance of that design in the submittal package. Depending on the design implementing, construction information may be required (and addressed on the plan). If the area verifying is not the most demanding then provide verification of a most demanding and pipe accordingly, etc., etc.
3. Provide correct information regarding the "new" tap off an existing supply. Data submittal may be included to clarify what the designer's intent is.
4. Provide:
a. Type of (copper) pipe and fittings.
b. Whether soldering or brazing.
c. Type of solder or braze and braze flux using, (since each is addressed in the code specifically).
5. Identify the hanger connection to the structure (which requires to be listed).
6. Hangers on copper piping have different spacing requirements than carbon steel. Address this change on the plans.
|
Miscellaneous action | | | 12/10/2004 | | DONE |
|
|
|
Returned plans (less 1) to call desk for returning.
|
Application received | | | 12/2/2004 | | |
|
|
|
|