Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberFIR04-00750
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 10740 W FAIRVIEW AVE
Project NameSPR D.I. CANOPY ADDITION
Customer Number 
ePlanReview 
Description
(DESERET INDUSTRIES) To install a (propylene glycol) anti-freeze loop system extension off the existing wet pipe fire sprinkler system, located in the "Customer Hold A117) with piping out to and under a new a 20" x 90" (obstructed construction) covered exterior storage area on the southwest corner of the building. This fire sprinkler work is related to the installation of columns, beams and metal roof deck. This building is fully fire sprinklered. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD04-02934.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/9/200511/10/200511/10/2005APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection11/8/200511/9/200511/9/2005AFAIL
DetailsTroy Cobbley
provide spare heads for canopy for the head box, expansion tank model number does not match plans verify use, run 2" forward flush/drain to exterior.
CHANGE STATUS TO (ISS)  11/8/2005 DONE
(F) Reprint permit  11/8/2005 DONE
Plan assigned to (Bill)10/5/2005 11/8/2005 DONE
DetailsBill Alexander
Permit Ready to Issue  11/1/2005 DONE
Inspection Record Card- Fire11/1/2005 11/1/2005 DONE
Telephone call  11/1/2005 DONE
Spoke with Diane and told her that permit is ready & fees///11/01/05 9:20am BAS
PLANS/APPL TAKEN TO FRONT DESK  10/31/2005 DONE
Sprinkler Plan Check10/5/2005 10/31/2005 PASS
DetailsBill Alexander
INSP-Sprinkler Rough-in/Hydro10/10/200510/10/200510/10/2005PPASS
DetailsTroy Cobbley
Hydro test for the outside canopy passed.
Plan resubmittals received  10/5/2005 DONE
INSP-Sprinkler Rough-in/Hydro7/8/20057/8/20057/8/2005PPART
DetailsTroy Cobbley
Piping hydro tested from the point of connection to the backflow preventor and passed. Still need earthquake bracing installed on 3" supply main.
FIR-Aging Inspection5/5/20055/5/20055/6/2005 NR
DetailsTroy Cobbley
work in progress
Issue permit  2/3/2005 DONE
Plan assigned to (Bill)12/3/2004 1/26/2005 DONE
Sprinkler Plan Check1/21/2005 1/26/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  1/26/2005 DONE
Inspection Record Card- Fire1/26/2005 1/26/2005 DONE
Permit Ready to Issue  1/26/2005 DONE
Telephone call  1/26/2005 DONE
tlk to secretary ###-#### that brad's permit and fees are ready to be picked up
Plan resubmittals received  1/21/2005  
Telephone call  12/13/2004 DONE
lft vm brad bettencourt - that permit needs to be returned to scope require a bld permit to attach with
Sprinkler Plan Check12/10/2004 12/10/2004 FAIL
DetailsBill Alexander
1. We are returning your plans until you can provide a valid and approved building review/permit meeting IBC and IFC requirements.
The following is required in order to meet BMC 7-01-09 Paragraph 105.1.1.1 and International Fire Code 105.4 submittal requirements.
2. When resubmitting, provide a copy of the companies contract relating to the final accepted bids/prices settlement (include all change-orders, extras, etc., cost for verification of BCO ยง4-02-28(2-B) which reads: "When the installation of sprinkler heads is not involved or insignificant due to the type of work being permitted, a plan review fee equivalent to 1.05% of the total bid price shall be assessed, up to a maximum of $3,150 (whichever is larger), and paid to the building official."
3. Include data submittals on the expansion chamber identifying the size incorporating, etc.
4. Address the backflow "burp cup" drain and where it will be exhausted.
5. Clarify the hanger detail addressing the "HangerMate ZE710" and its UL and/or FM listing limits.
6. Provide canopy roof construction which includes type of truss, joist, and related, etc.
Telephone call  12/10/2004 DONE
Faxed letter back to Brad Bettencourt.
Application received  12/3/2004