INSP-Final Inspection | 6/22/2006 | 6/23/2006 | 6/23/2006 | P | PASS |
Forrest France
|
|
|
Two missing escutcheons, hyd. calc sticker, locks a control valves, and antifreeze sign installed while on site. Final inspection passed, permit finaled.
|
INSP-Supply line flush | 6/15/2006 | 6/16/2006 | 6/16/2006 | A | PART |
Forrest France
|
|
|
Fire supply line flush performed satisfactory.
|
Issue and Print Permit | | | 5/4/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/21/2006 | | 5/3/2006 | | PASS |
Bill Alexander
|
|
|
Field Modifications
|
Plan assigned to (Bill) | 4/21/2006 | | 5/3/2006 | | DONE |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/3/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/3/2006 | | DONE |
|
|
|
tlk to shilo auto ###-#### that permit and fees are ready to be picked up
|
Plan resubmittals received | | | 4/21/2006 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 12/29/2004 | 1/3/2005 | 1/3/2005 | P | PART |
Rick Jackson
|
|
|
This is a rough to cover. Our contact is Scott Carter at ###-####; Phone #: ###-#### Internet Inspection Request from: Trent Bice Okay to cover - as-builts needed for changes to piping; riser not complete and will have changes from approved plan 1/3/2005 1:00:40 PM
|
Plan assigned to (Bill) | 12/6/2004 | | 12/14/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/6/2004 | | 12/14/2004 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/14/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/14/2004 | | 12/14/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/14/2004 | | DONE |
|
|
|
|
Telephone call | | | 12/14/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 12/14/2004 | | DONE |
|
|
|
|
Application received | | | 12/6/2004 | | |
|
|
|
|