INSP-Alarm Testing | 2/7/2005 | 2/7/2005 | 2/7/2005 | A | PASS |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 2/7/2005 at 6:16:19 AM. Contact: ###-####.
|
DOC - Permit Finaled | 2/7/2005 | 2/7/2005 | 2/7/2005 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 2/7/2005 12:31:41 PM
|
INSP-Alarm Testing | 2/4/2005 | 2/4/2005 | 2/4/2005 | P | FAIL |
Troy Cobbley
|
|
|
rand; Phone #: ###-#### I showed up and found there is a trouble on the duct detector zone that the fire alarm contractor is trouble shooting. Inspection to be rescheduled. 2/4/2005 4:05:58 PM
|
INSP-Alarm Testing | 2/2/2005 | 2/2/2005 | 2/2/2005 | P | FAIL |
Troy Cobbley
|
|
|
Trouble does not report on the duct detectors. 2/2/2005 3:46:35 PM
|
INSP-Final Inspection | 1/21/2005 | 1/21/2005 | 1/21/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave millers permission. The duct detector problem in the preschool needs addressed.
|
CHANGE STATUS TO (ISS) | | | 1/21/2005 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/29/2004 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 12/6/2004 | | 12/23/2004 | | DONE |
|
|
|
|
Alarm Plan Check | | | 12/23/2004 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/23/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/23/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/23/2004 | | 12/23/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/16/2004 | | |
|
|
|
|
Alarm Plan Check | | | 12/9/2004 | | FAIL |
|
|
|
Resubmittal required. Faxed to Rand Gruber.
|
Plan resubmittals received | | | 12/7/2004 | | DONE |
|
|
|
|
Application received | | | 12/6/2004 | | |
|
|
|
|
Case Summary | | | 12/6/2004 | | DONE |
|
|
|
|