INSP-Final Inspection | 5/16/2005 | 5/17/2005 | 5/17/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire alarm finaled
|
INSP-Alarm Testing | 5/13/2005 | 5/16/2005 | 5/16/2005 | A | FAIL |
Troy Cobbley
|
|
|
Provide signal verification and nfpa 72 record of completion forms.
|
Alarm Plan Check | | | 5/12/2005 | | PASS |
|
|
|
Plan Modification. Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2005 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/12/2005 | | DONE |
|
|
|
|
INSP-Alarm Testing | 5/5/2005 | 5/6/2005 | 5/6/2005 | A | PART |
Troy Cobbley
|
|
|
Contact: ###-####. See approved plans, sheet 1 for items left to verify.
|
Plan resubmittals received | | | 5/6/2005 | | |
|
|
|
|
INSP-Alarm Testing | 5/4/2005 | 5/5/2005 | 5/5/2005 | A | PART |
Troy Cobbley
|
|
|
Tested initiating devices on the first floor. This includes smokes, pulls and sprinkler devices. Need to test heat detectors, verify ceiling a/v's are listed for ceiling, add a/v in the electrical room and get the addresses straightened out.
|
INSP-Alarm Testing | 5/3/2005 | 5/4/2005 | 5/4/2005 | A | PART |
Troy Cobbley
|
|
|
The only items tested today were the battery load and the phone lines which both passed.
|
Plan assigned to (Mary) | 12/14/2004 | | 1/13/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 1/13/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/13/2005 | | 1/13/2005 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/13/2005 | | |
|
|
|
|
INSP-Conference | 1/7/2005 | 1/7/2005 | 1/7/2005 | P | DONE |
Troy Cobbley
|
|
|
I was at the job site doing a fire sprinkler rough-in on the 3rd and 4th floors and found fire alarm device backboxes and wire installed throughout the 3rd floor and in small areas of the 4th floor. After verifing that only the 2nd floor had be approved for starting with Mary and Dave I issued a stop work order to the project superintendant. Stop work order is for all fire alarm work and sheet rock work that would cover up the fire alarm work. I made this clear with the superintendant.
|
Plan resubmittals received | | | 1/6/2005 | | |
|
|
|
|
Alarm Plan Check | | | 12/23/2004 | | FAIL |
|
|
|
Resubmittal required. Faxed comments to Matt Casey.
|
Miscellaneous action | | | 12/16/2004 | | DONE |
|
|
|
Dave Miller approved early start for the 2nd floor only. See attached e-mail.
|
Application received | | | 12/14/2004 | | |
|
|
|
|