INSP-Final Inspection | 1/19/2005 | 1/19/2005 | 1/19/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinklers finaled
|
DOC - Permit Finaled | 1/19/2005 | 1/19/2005 | 1/19/2005 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 1/19/2005 1:22:46 PM
|
INSP-Final Inspection | 1/6/2005 | 1/6/2005 | 1/6/2005 | A | FAIL |
Troy Cobbley
|
|
|
Insulation backing previously attached to the deck at the new wall is hanging down and blocking upright head coverage. This is on the go-kart side of the wall. I notified Larry in Emser Tile of this.
|
INSP-Sprinkler Rough-in | 1/5/2005 | 1/5/2005 | 1/5/2005 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection 1/5/2005 2:54:35 PM
|
INSP-Final Inspection | 1/5/2005 | 1/5/2005 | 1/5/2005 | P | FAIL |
Troy Cobbley
|
|
|
Provide access to the east side of the new wall for inspection of the existing sprinkler heads. Provide annual inspection for the existing sprinkler riser. I notified manager of Emser Tile that the new area is not to be used until all inspections had been approved or action would be taken by the building and fire departments. 1/5/2005 2:56:27 PM
|
Issue permit | | | 1/3/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/29/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/29/2004 | | 12/29/2004 | | DONE |
|
|
|
|
Telephone call | | | 12/29/2004 | | DONE |
|
|
|
Spoke with Jeff and told him that permit is ready & fees///12/29/04 BAS
|
Plan assigned to (Bill) | 12/16/2004 | | 12/27/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/16/2004 | | 12/27/2004 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/27/2004 | | DONE |
|
|
|
|
Case Summary | | | 12/27/2004 | | DONE |
|
|
|
|
Application received | | | 12/16/2004 | | |
|
|
|
|