INSP-Final Inspection | 5/20/2005 | 5/20/2005 | 5/20/2005 | P | PASS |
Forrest France
|
|
|
Fire sprinkler finaled.
|
INSP-Final Inspection | 4/21/2005 | 4/22/2005 | 4/22/2005 | A | FAIL |
Forrest France
|
|
|
Pipe size installed in mechanical room does not meet requirements of note #2 on review comments.
|
Telephone call | | | 3/23/2005 | | DONE |
|
|
|
gave plans to customer-no fee due
|
Telephone call | | | 3/18/2005 | | DONE |
|
|
|
tlk to tom easton that permit and no fees to be picked up
|
Sprinkler Plan Check | 3/3/2005 | | 3/17/2005 | | PASS |
Bill Alexander
|
|
|
Field Changes
|
Miscellaneous action | | | 3/17/2005 | | DONE |
|
|
|
Took plans to front desk for returning.
|
INSP-Sprinkler Rough-in/Hydro | 3/3/2005 | 3/3/2005 | 3/3/2005 | P | PART |
Troy Cobbley
|
|
|
Piping in room southwest of stairs can be covered. Per contractor plans are being resubmitted to show changes in piping. 3/3/2005 3:51:35 PM
|
Plan resubmittals received | | | 3/3/2005 | | DONE |
Bill Alexander
|
|
|
|
Issue and Print Permit | | | 1/7/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/4/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/4/2005 | | 1/4/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/4/2005 | | 1/4/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 12/28/2004 | | 1/3/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/28/2004 | | 1/3/2005 | | PART |
Bill Alexander
|
|
|
Provide separate plans with calculations addressing the required separation (water curtain) meeting 11.2.3.1.8(5) for the open stairway between the 19th and 20th floors in this building. IFC Fire/Life Safety Inspector shall verify by documentation within this permit prior to finalizing this permit. (BMC 7-01-50 revised paragraph 901.2, BMC 7-01-53 new paragraph 903.1.3, IFC 105.4.2)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2005 | | DONE |
|
|
|
|
Application received | | | 12/28/2004 | | |
|
|
|
|