INSP-Final Inspection | 3/7/2005 | 3/7/2005 | 3/7/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinklers finaled 3/7/2005 3:54:59 PM
|
DOC - Permit Finaled | 3/7/2005 | 3/7/2005 | 3/7/2005 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 3/7/2005 3:55:03 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/1/2005 | 3/1/2005 | 3/1/2005 | P | FAIL |
Troy Cobbley
|
|
|
See approved plans for locations that require corrections. 3/1/2005 4:01:39 PM
|
Issue and Print Permit | | | 3/1/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 2/22/2005 | | 2/28/2005 | | PASS |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 2/22/2005 | | 2/28/2005 | | PASS |
Bill Alexander
|
|
|
Filed changes/modifications.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/28/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/28/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Plan resubmittals received | | | 2/22/2005 | | DONE |
|
|
|
|
INSP-Conference | 2/3/2005 | 2/4/2005 | 2/4/2005 | A | PART |
Rick Jackson
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Met with Mick and there are numerous obstructions above the grid that will require re-design and resubmittals 2/4/2005 9:48:07 AM
|
Issue and Print Permit | | | 1/13/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 12/30/2004 | | 1/5/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/30/2004 | | 1/5/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/5/2005 | | 1/5/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/5/2005 | | DONE |
|
|
|
|
Telephone call | | | 1/5/2005 | | DONE |
|
|
|
tlk to tom easton - ###-#### that his permit and fees are ready to be picked up
|
Application received | | | 12/30/2004 | | |
|
|
|
|