INSP-Final Inspection | 6/1/2005 | 6/1/2005 | 6/1/2005 | A | PASS |
Forrest France
|
|
|
Fire sprinkler finaled.
|
INSP-Final Inspection | 5/23/2005 | 5/23/2005 | 5/23/2005 | P | FAIL |
Forrest France
|
|
|
Q.R.E.C G.B heads in one compartment of bank vault are mixed with a solder link head in the same compartment, verify if response time is the same to meet NFPA 8.3.3.2. Verify if vault area is indeed LH, it appears to be used as storage.
|
INSP-Final Inspection | 5/20/2005 | 5/20/2005 | 5/20/2005 | P | FAIL |
Forrest France
|
|
|
Remove fire sprinkler canopy at front entry first floor that has been used as a coverplate for a previously used hole. Inadequate sprinkler coverage in basement bank vault as installed, heads are overspaced off wall.
|
INSP-Final Inspection | 4/18/2005 | 4/19/2005 | 4/19/2005 | A | FAIL |
Forrest France
|
|
|
2nd floor rough-in fail inspection. Two pendent heads in CEO office are too close to heat diffusers - must be min. one foot away or increase temp. rating. Upright head blocked in open office without ceiling, verify drop ceiling install or correct the
|
INSP-Final Inspection | 4/15/2005 | 4/18/2005 | 4/18/2005 | A | FAIL |
Forrest France
|
|
|
Contact: ###-####. Fail inspection, approved plans not available on site for review.
|
Sprinkler Plan Check | 3/7/2005 | | 3/21/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/21/2005 | | 3/21/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/21/2005 | | DONE |
|
|
|
|
Telephone call | | | 3/21/2005 | | DONE |
|
|
|
left ms with secretary ###-#### that permit and fees are ready to be picked up
|
Issue permit | | | 3/21/2005 | | |
|
|
|
|
Plan assigned to (Bill) | 2/25/2005 | | 3/21/2005 | | DONE |
Bill Alexander
|
|
|
|
Plan resubmittals received | | | 3/7/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/25/2005 | | 3/2/2005 | | FAIL |
Bill Alexander
|
|
|
Field modfications, changes and corrections.
1. Several areas modified by field changes do not match the system design verified, (number of sprinklers on the corresponding sized piping) relating to the most remote test area verified. System design layout shall match whatever the Designer verifies throughout the remainder of the floor, or whatever he is verifying in his design with no exception aloud. (BMC 7-01-50:901.2, IFC 105.4.2, NFPA 13:4.3)
2. Reinstitute the room identifications (per requirement addressed in NFPA 13-14.1.1[7], and the ceiling elevations (specifically where soffits and ceiling changes occur in the same area/s), on the 2nd floor plan.
3. Address and clarify sprinkler head location and deflector distance requirements on the plans for ceiling changes and obstructions rules for the Board Room and the Executive Conference rooms, since there could be a possible installation code issue involved with each. (IFC 105.4.2, BMC 7-01-50, Section 901.2)
|
Miscellaneous action | | | 3/2/2005 | | DONE |
|
|
|
Returned plans to front desk for returning and corrections
|
Telephone call | | | 3/2/2005 | | DONE |
|
|
|
Spoke with Gerald and told him that permit failed and plans need picked up////3/2/05 9:15am BAS
|
Plan resubmittals received | | | 2/25/2005 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 2/22/2005 | 2/23/2005 | 2/23/2005 | P | PART |
Troy Cobbley
|
|
|
basement hydro test passed. Could not do a rough-in inspection due to plans not matching installation. I spoke to Gerald at Treasure Valley about this. 2/23/2005 2:47:38 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/16/2005 | 2/17/2005 | 2/17/2005 | A | PART |
Troy Cobbley
|
|
|
Second floor rough-in is ok but need armovers inspected when complete. Hardlid areas are ok to cover. Need resubmittals showing piping changes on second floor 2/17/2005 11:26:49 AM
|
Permit Ready to Issue | | | 1/6/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/6/2005 | | 1/6/2005 | | DONE |
|
|
|
|
Telephone call | | | 1/6/2005 | | DONE |
|
|
|
Spoke with Gerald and told him that permit is ready & fees///1/6/04 8:20am BAS
|
Issue permit | | | 1/6/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 12/30/2004 | | 1/5/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/30/2004 | | 1/5/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2005 | | DONE |
|
|
|
|
Case Summary | | | 12/30/2004 | | DONE |
|
|
|
|
Application received | | | 12/30/2004 | | |
|
|
|
|