INSP-Final Inspection | 3/25/2005 | 3/25/2005 | 3/25/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinkler finaled 3/25/2005 10:58:09 AM
|
DOC - Permit Finaled | 3/25/2005 | 3/25/2005 | 3/25/2005 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 3/25/2005 10:58:13 AM
|
INSP-Supply line flush | 3/23/2005 | 3/23/2005 | 3/23/2005 | P | PASS |
Troy Cobbley
|
|
|
john; Phone #: ###-#### Underground flush ok. 3/23/2005 3:34:19 PM
|
INSP-Sprinkler Rough-in | 1/20/2005 | 1/20/2005 | 1/20/2005 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler rough-in for the overhead piping and the tenting is ok for cover. Riser is not yet built. Water meter is 1" as shown on plans. 1/20/2005 1:45:39 PM
|
Telephone call | | | 1/11/2005 | | DONE |
|
|
|
Spoke with Greg and told him that permit is ready & fees///01/11/05 8:15am BAS
|
Issue and Print Permit | | | 1/11/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 1/4/2005 | | 1/10/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/4/2005 | | 1/10/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/10/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/10/2005 | | 1/10/2005 | | DONE |
|
|
|
|
Application received | | | 1/4/2005 | | |
|
|
|
|