Permit Information
Permit NumberFIR05-00016
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 4601 S SURPRISE WAY
Project NameSPR UG TRINITY PRESBYTERIAN
Customer Number 
ePlanReview 
Description
(TRINITY PRESBYTERIAN CHURCH) * To install approximately 30'-0" of 6" C-900 PVC underground fire service supply, connected to an existing 8" loop, which is connected to an existing 12" circulating service supply. The tap is on the southwest (back side) of the proposed structure and run Northeast under the footing and up into a proposed mechanical room with 6" Ductile Iron with a M.J. flange adapter approximately 6" to 1'-0" off the floor. This service supply is for the fire sprinkler protection of a new 28,556-ft/2, one story, Type III-B (fully fire sprinklered) church building. This building will also house a Group I-4 daycare for 118 children which will have a separate certificate of occupancy issued under MIS04-00274. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD04-01909.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/12/20061/12/20061/12/2006PPASS
DetailsForrest France
UG fire supply line finaled.
INSP-Sprinkler Rough-in/Hydro8/10/20058/11/20058/11/2005PPASS
DetailsTroy Cobbley
Underground supply line hydro test passed
INSP-Supply line flush4/14/20054/15/20054/15/2005PPASS
DetailsForrest France
Fire supply line flush satisfactory.
INSP-Sprinkler Rough-in/Hydro4/15/20054/15/20054/15/2005PPASS
DetailsForrest France
Underground fire supply line hydrostatic test passed.
INSP-Sprinkler Rough-in/Hydro4/7/20054/7/20054/7/2005PPART
DetailsForrest France
Underground supply is ok to cover
Permit Ready to Issue  2/1/2005  
Inspection Record Card- Fire2/1/2005 2/1/2005 DONE
Telephone call  2/1/2005 DONE
left mess that permit is ready
Issue permit  2/1/2005  
Plan assigned to (Bill)1/11/2005 1/14/2005 DONE
Sprinkler Plan Check1/11/2005 1/14/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  1/14/2005 DONE
Application received  1/11/2005