INSP-Final Inspection | 1/12/2006 | 1/12/2006 | 1/12/2006 | P | PASS |
Forrest France
|
|
|
UG fire supply line finaled.
|
INSP-Sprinkler Rough-in/Hydro | 8/10/2005 | 8/11/2005 | 8/11/2005 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line hydro test passed
|
INSP-Supply line flush | 4/14/2005 | 4/15/2005 | 4/15/2005 | P | PASS |
Forrest France
|
|
|
Fire supply line flush satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 4/15/2005 | 4/15/2005 | 4/15/2005 | P | PASS |
Forrest France
|
|
|
Underground fire supply line hydrostatic test passed.
|
INSP-Sprinkler Rough-in/Hydro | 4/7/2005 | 4/7/2005 | 4/7/2005 | P | PART |
Forrest France
|
|
|
Underground supply is ok to cover
|
Permit Ready to Issue | | | 2/1/2005 | | |
|
|
|
|
Inspection Record Card- Fire | 2/1/2005 | | 2/1/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/1/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 2/1/2005 | | |
|
|
|
|
Plan assigned to (Bill) | 1/11/2005 | | 1/14/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/11/2005 | | 1/14/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/14/2005 | | DONE |
|
|
|
|
Application received | | | 1/11/2005 | | |
|
|
|
|