INSP-Final Inspection | 1/26/2007 | 1/29/2007 | 1/29/2007 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 1/9/2007 | 1/10/2007 | 1/10/2007 | A | FAIL |
Troy Cobbley
|
|
|
See city approved plans for items still needing completed.
|
INSP-Final Inspection | 1/2/2007 | 1/3/2007 | 1/3/2007 | A | FAIL |
Troy Cobbley
|
|
|
There were not approved and updated plans on site for the inspection.
|
Issue and Print Permit | | | 8/22/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/21/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/21/2006 | | 8/21/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/21/2006 | | DONE |
|
|
|
spoke to john@###-####/told permit was ready, permit#, project name & address, and fee
|
Sprinkler Plan Check | | | 8/16/2006 | | PASS |
|
|
|
As-builts reviewed/approved by B. Johnson
|
Plan resubmittals received | | | 7/26/2006 | | DONE |
|
|
|
Plan mod to reflect field installation changes.
|
INSP-Final Inspection | 2/13/2006 | 2/14/2006 | 2/14/2006 | A | FAIL |
Troy Cobbley
|
|
|
See city approved plans for deficiencies which include resubmitting plans for piping changes in the second floor storage room remote area. The riser is missing items for the final such as stickers and the backflow preventor is incorrect.
|
Permit Ready to Issue | | | 2/13/2006 | | DONE |
|
|
|
|
Telephone call | | | 2/13/2006 | | DONE |
|
|
|
tlk to john warnick - ###-#### that permit and fees are ready to be picked up
|
(F) Reprint permit | | | 2/13/2006 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/13/2006 | | DONE |
|
|
|
already issued previously
|
Sprinkler Plan Check | 1/24/2006 | | 2/10/2006 | | PASS |
|
|
|
Plans re submittals reviewed and accepted pending satisfactory field verification by PDS fire inspector. See attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/24/2006 | | DONE |
|
|
|
|
INSP-Supply line flush | 1/10/2006 | 1/10/2006 | 1/10/2006 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 1/4/2006 | 1/5/2006 | 1/5/2006 | A | PASS |
Troy Cobbley
|
|
|
overhead / underground hydro passed
|
CHANGE STATUS TO (ISS) | | | 1/4/2006 | | DONE |
|
|
|
already pd previously
|
Sprinkler Plan Check | 12/28/2005 | | 12/30/2005 | | PART |
Bill Alexander
|
|
|
Plan corrections have not been made. This submittal is for one head added only.
|
Plan assigned to (Bill) | 12/28/2005 | | 12/30/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/30/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/30/2005 | | DONE |
|
|
|
|
Telephone call | | | 12/30/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Plan resubmittals received | | | 12/28/2005 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 10/17/2005 | 10/17/2005 | 10/17/2005 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line is ok to cover
|
INSP-Sprinkler Rough-in | 10/3/2005 | 10/4/2005 | 10/4/2005 | A | PART |
Troy Cobbley
|
|
|
Office area only is ok to cover. Two upright sprinkler heads are blocked by duct work as marked on the approved plans. This will need to be fixed prior to final.
|
Inspection Record Card- Fire | 8/25/2005 | | 8/25/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/25/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/25/2005 | | DONE |
|
|
|
tlk to john ###-#### that permit and fees are ready to be picked up
|
Issue permit | | | 8/25/2005 | | |
|
|
|
|
Plan assigned to (Bill) | 8/9/2005 | | 8/24/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/15/2005 | | 8/24/2005 | | PART |
Bill Alexander
|
|
|
Reference Review Comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/15/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/11/2005 | | DONE |
|
|
|
customer took failed plans
|
Sprinkler Plan Check | 7/28/2005 | | 8/10/2005 | | FAIL |
Bill Alexander
|
|
|
|
Telephone call | | | 8/10/2005 | | DONE |
|
|
|
tlk to john warnick that permit failed and ready to be picked up
|
Plan resubmittals received | | | 7/28/2005 | | |
|
|
|
|
Permit EXPIRED | | | 5/2/2005 | | DONE |
|
|
|
|
Telephone call | | | 3/17/2005 | | DONE |
|
|
|
Per Sam plans failed/ contractor came in & picked them up///JRR
|
Sprinkler Plan Check | 3/4/2005 | | 3/10/2005 | | FAIL |
Bill Alexander
|
|
|
The data has been moved to a Word document attached to this case.
|
Miscellaneous action | | | 3/10/2005 | | DONE |
|
|
|
Returned documents to fron permit desk for calling and returning.
|
Telephone call | | | 3/10/2005 | | DONE |
|
|
|
tlk to john warnick that fire permit needs plan resubmitted required cmc
|
Meeting | | | 3/7/2005 | | DONE |
|
|
|
Office meeting with Sam Rogers reviewing request and decided it should be the Fire Marshals decision per BMC 7-01-56 AMENDMENT ADDING SECTION 903.1.6, HIGH PILED COMBUSTIBLE STORAGE WAREHOUSE, Add a Section 903.1.6, which reads: "It shall be the responsibility of the code official to evaluate all requests for a system layout meeting the requirements for a less hazardous storage configuration."
|
Telephone call | | | 3/7/2005 | | DONE |
|
|
|
Left message (cell) Jerry Prinzing, for call back regarding "Spec Warehouse" review approval 2:45pm.
|
Plan resubmittals received | | | 3/4/2005 | | DONE |
|
|
|
Letter from Doug Bagley, (Bagley-Bushgel Buildings), through John Warnick (Commercial Fire Protection), requesting approval as stated.
|
Miscellaneous action | | | 3/4/2005 | | DONE |
|
|
|
Sent letter with (City copy) plan for verification/approval to Sam Rogers.
|
Sprinkler Plan Check | 2/1/2005 | | 2/8/2005 | | FAIL |
Bill Alexander
|
|
|
The data has been moved to a Word document attached to this case.
|
Case Summary | | | 2/8/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/8/2005 | | 2/8/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/8/2005 | | DONE |
|
|
|
left mess that permit has failed and needs to be picked up
|
Plan resubmittals received | | | 2/1/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/13/2005 | | 1/19/2005 | | FAIL |
Bill Alexander
|
|
|
Requires a meeting to go over materials submitted.
1/25/2005, 10:30AM. Met with Ray Lopez and went over submitted drawing problems in meeting minimum submittal, design, installation, code and review requirements. Returned all drawing except 1 set.
|
Telephone call | | | 1/19/2005 | | DONE |
|
|
|
to tlk secretary for john ###-#### that his permit has failed and needs to be picked up
|
Application received | | | 1/13/2005 | | |
|
|
|
|
Case Summary | | | 1/13/2005 | | DONE |
|
|
|
|