Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR05-00037
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 404 S 8TH ST (BASE / 1ST / 2ND FLRS)
Project NameSPR 8TH ST MRKTPLC BASEMENT
Customer Number 
ePlanReview 
Description
(8TH STREET MARKETPLACE - BUILDING 404 - BASEMENT RESTROOM WORK ONLY) This fire sprinkler permit is limited to the scope of work outlined here. To relocate and add fire sprinklers for the new bathroom and remodeled bathroom located in the basement of the "The 8th Street Market Place" addressed as 404 S. 8th Street. No selective fire sprinkler demolition is covered under this permit. Fire sprinkler work is related to the new core restrooms in the basement only. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD03-02412.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary  3/3/2008 DONE
(F) Reprint permit  3/3/2008 DONE
INSP-Final Inspection8/10/20068/11/20068/11/2006APASS
DetailsForrest France
Fire sprinkler inspection passed, permit finaled.
Override - Parcel Holds1/1/19001/1/19008/2/2006  
Miscellaneous action  7/27/2006  
plans picked up from 2nd review, permit already issued status
(F) Reprint permit  7/27/2006 DONE
Sprinkler Plan Check7/18/2006 7/26/2006 PASS
DetailsBill Alexander
As Built
Miscellaneous action  7/26/2006 DONE
Took Modified plans to permit desk for releasing. 2nd review, no fee.
Telephone call  7/26/2006 DONE
spoke to randy@###-####/told permit was ready, permit#, address & project name, and no fees
Plan resubmittals received  7/18/2006  
Case Summary  4/13/2006  
INSP-Sprinkler Rough-in/Hydro2/23/20052/23/20052/23/2005PPART
DetailsTroy Cobbley
With Bill Alexander's permission the remodeled restroom fire sprinklers appear ok. Resubmittals will be required before final will be given. 2/24/2005 9:53:07 AM
INSP-Sprinkler Rough-in/Hydro2/22/20052/22/20052/22/2005PCANC
DetailsTroy Cobbley
Tile workers were installing the floor so there is no access at this time. 2/22/2005 4:03:24 PM
INSP-Sprinkler Rough-in2/11/20052/11/20052/11/2005PFAIL
DetailsTroy Cobbley
Floor plan does not match fire sprinkler plans. Piping sizing on plan does not match field. Quick responce and standard responce heads are mixed and different temperatures from listing on plans. Sidewall head too far from ceiling. One pendant not installed yet. Two uprights blocked by new soffits. Inspection stopped. Plans need to be resubmitted. 2/11/2005 4:17:02 PM
Issue and Print Permit  1/26/2005 DONE
Plan assigned to (Bill)1/19/2005 1/25/2005 DONE
Sprinkler Plan Check1/19/2005 1/25/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  1/25/2005 DONE
Inspection Record Card- Fire1/25/2005 1/25/2005 DONE
Permit Ready to Issue  1/25/2005 DONE
Telephone call  1/25/2005 DONE
lft mes with secretary ###-#### that permit and fees are ready to picked up
Application received  1/19/2005  
INSP-Final Inspection8/2/20068/3/2006 P 
DetailsForrest France
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles