Permit Information
Permit NumberFIR05-00044
StatusFinaled
Name AEI
Site Address 4601 S SURPRISE WAY
Project NamealmTRINITY PRESBYTERIAN CHURCH
Customer Number 
ePlanReview 
Description
To provide a required manual fire alarm system. The required manual fire alarm system includes sprinkler monitoring, automatic detection (Section B only), HVAC shutdown, door release, notification (Section B only) and voice evac (Section A only) throughout.

The associated building permit (BLD 04-01909) is to construct a 28,556 sq. ft. one story Type IIIB fully fire sprinklered church building. Other work includes all site improvements, paving and landscaping per approved plans and attachments. Fire sprinklers are used for area. A two hour fire barrier wall will provide for two separate fire areas for fire alarm purposes only. This building will also house a Group I-4 daycare for 118 children which will have a separate certificate of occupancy issued under MIS04-00274.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/7/20059/8/20059/8/2005PPASS
DetailsForrest France
Fire alarm permit finaled.
INSP-Final Inspection8/31/20059/1/20059/1/2005APART
DetailsForrest France
Provide permanent dual phone lines or approval letter for temporary lines at job trailer.
Miscellaneous action  9/1/2005 DONE
Received letter from Joe Jackson (ESI) that the construction trailer will remain and the phone lines will be intact. Qwest is to be out to the site 9/6 for permanent phone lines in the building. Sam Rogers has approved a temp occupancy based upon the letter and the phone install date. Existing phone lines have not been tested.
INSP-Final Inspection8/30/20058/31/20058/31/2005PPART
DetailsForrest France
Forrest, Here is the inspection request for the completion of the final test at Trinity Presbyterian. If there is any problems meeting out there at 12:00p.m., please let us know. My cell is ###-#### if you cannot reach me at the office. Thanks, Jason; Phone #: ###-#### Internet Inspection Request from: Jason Minnick

Forrest, all checked out, one final issue is the phone lines are routed to the General Contractors trailer (temproary), so I did not test them. ESI is aware of the situation and will need to determine their plan of attack. I have told Jason and he will contact them. They have a choice of two options. 1) Provide the two permanent phone lines and test. 2) If they want to request a "temp" so they can move this weekend, they will need to supply a letter stating the trailer and phone lines will remain intact til the permanent ones are provided, probably need to test also. Sam is off tomorrow, so if they want a temp, they will need to request it today.
Case Summary  8/31/2005 DONE
INSP-Alarm Testing8/29/20058/30/20058/30/2005APART
DetailsForrest France
Partial inspection performed on area B, tested smoke and heat detectors, manual pull stations, and horn strobes, still need to test duct smoke detectors, battery, phone lines.
INSP-Final Inspection8/26/20058/29/20058/29/2005ANR
DetailsForrest France
Inspection is scheduled for 8/30 at 12:00 noon.
INSP-Final Inspection8/25/20058/26/20058/26/2005AFAIL
DetailsForrest France
The strobe lens on several notification devices throughout areas A and B are below the allowed height AFF for wall mounted applications.
INSP-Final Inspection8/24/20058/25/20058/25/2005PCANC
DetailsForrest France
Inspection has been rescheduled for friday the 26th per Jason at ###-####.
Plan assigned to (Mary)1/21/2005 7/6/2005 DONE
Alarm Plan Check  7/6/2005 PASS
Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  7/6/2005 DONE
Inspection Record Card- Fire7/6/2005 7/6/2005 DONE
Telephone call  7/6/2005 DONE
called told mike permit is ready and no fees
Permit Ready to Issue  7/6/2005 DONE
Issue and Print Permit  7/6/2005 DONE
Plan resubmittals received  7/1/2005  
Case Summary  7/1/2005 DONE
Alarm Plan Check  1/25/2005 FAIL
Resubmittal required. Faxed comments to Jason Minnick (AEI).
Application received  1/21/2005