INSP-Final Inspection | 2/16/2005 | 2/17/2005 | 2/17/2005 | A | PASS |
Troy Cobbley
|
|
|
###-#### - mick
|
DOC - Permit Finaled | 2/17/2005 | 2/17/2005 | 2/17/2005 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 2/17/2005 9:30:06 AM
|
Miscellaneous action | | | 2/14/2005 | | DONE |
|
|
|
Took revised plans to the permit desk for calling and returning.
|
Sprinkler Plan Check | 2/10/2005 | | 2/14/2005 | | PASS |
Bill Alexander
|
|
|
Site revisions/verifications (calcs).
|
Plan resubmittals received | | | 2/10/2005 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 2/7/2005 | 2/8/2005 | 2/8/2005 | A | PART |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover except for the three areas marked on the approved plans that need modifications. One overspaced pendant upfront and two pendants off of 1" outlet in the rear. 2/8/2005 10:27:29 AM
|
Issue and Print Permit | | | 1/31/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/28/2005 | | 1/28/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/28/2005 | | |
|
|
|
|
Telephone call | | | 1/28/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (Bill) | 1/25/2005 | | 1/27/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/25/2005 | | 1/27/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2005 | | DONE |
|
|
|
|
Application received | | | 1/25/2005 | | |
|
|
|
|